FOB Price
Obtenir le dernier prix10000USD /
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
50
Packaging Detail:
-
Delivery Time:
20 DAY
Supplying Ability:
-
Payment Type:
-
Tank material stainless steel **4 2B Manifold Casing Material stainless steel Frame Material stainless steel Pipe in the tank 1.2mm**2.5mm Copper Insulation Polyurethane *0mm Rubber Seals and Rings UV stabilized high temperature silicone rubber standard Pressure ≤1.2Mpa Mounting angle *5℃**0℃ Collector mounting Flat roof/inclined roof