Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Waste Water Treatment Equipment for Residential Sewage
Next

Waste Water Treatment Equipment for Residential Sewage

( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

hwl-5-300

Prix FOB:

( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

other

Heure de livraison:

38days-65days

Capacité de Fournir:

100 Set per Month

Payment Type:

-

Groupe de produits :

Contacter maintenant
9th Année

Personne à contacter Mr. Bob

803, Building19, No.12 Jinhuan Road, Fuzhou, Fujian, P.R

Contacter maintenant

La description

I.Description:

This design is based on China Standard GB ****8-***2(I-B) for residential sewage water after treatment, for purpose of environment protection.

 Advanced technology,reliableconvenience in operation, easy maintenance,lowrunning costs,water stability, the main equipmentfor the carbon steel structure,taking into account theenvironmental andhealth issuessurroundingthe water treatment plant, sothat thesewagetreatment projectisdecided to usethe wholeundergroundstructure, above the equipment,flowers and trees can be plantedso as tofurther beautifyenvironment.Covering limited space, reasonable layout.long running life,effective and automatic running. Pre-reflowNitrolysissludgeprocesses is used toreducethe amount ofsludge.

II.Here we recommend as the following process flow :

Residential Waste water collected →metal screen Grid(grill) filtering→Adjusting Deposite pond→Our water treatment System→Water Deposite pond→active carbon filter→quartz sand filter→Final Clean Water for agricultural Irrigation/discharge into river.

 

III.Design principle:

Sewage waste wateris collected by thedrainage system from residents, and thesewage waste water goesinto themetal (grid)grill well, andafter removal offloatedparticulatedebris,the water entersinto the conditioning(adjusting)pond,where the water ishomogenizedviaadjustment,alevel controller is equipped besides this pond,sothe signalthrough thelevel controldevice instructspump to pump thewater tothe Anaerobicpond,acidifiedhydrolysis andnitrification and denitrification, reducingthe concentrationof organic matter,removingpart of theammonia, andthen water flows intobiological contactoxidation pond A and Bforbiochemical reactions, suchponds aredivided into twobiologicalstages, wheremost of thebiological oxidationof organic pollutantsareadsorbedand degraded,with help oftheeffluentgravity,solid-liquid separationacts in deposite tankwhere waterflows intothe supernatantdisinfection pond, in whichchlorinationtabletsaredissolvedto killharmfulbacteria.

We can offer design/installation service as required.

Pays: China
N ° de modèle: hwl-5-300
Prix FOB: ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: 1 Set
Packaging Detail: other
Heure de livraison: 38days-65days
Capacité de Fournir: 100 Set per Month
Payment Type: -
Groupe de produits : waste water trreatment
Waste Water Treatment Equipment for Residential Sewage

Send a direct inquiry to this supplier

To:

Mr. Bob < HAWKIWEL INDUSTRIES LIMITED >

Je veux savoir: