Prix FOB
Obtenir le dernier prix( Negotiable )
|- Minimum Order
Pays:
UK
N ° de modèle:
008
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
UK
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
as per required
Heure de livraison:
10 to 15 days
Capacité de Fournir:
-
Payment Type:
T/T
Groupe de produits :
-
Used steel rails are previously installed railway tracks that have
been removed from service and are now available for recycling or
repurposing. These rails, made from high-strength steel, are
typically reclaimed from decommissioned railways, construction
projects, or track upgrades. Despite their previous use, they
retain significant structural integrity and value. Recycled steel
rails can be refurbished for reuse in new rail infrastructure, or
melted down and processed into new steel products. The recycling of
used steel rails contributes to resource conservation and reduces
the environmental impact of steel production by allowing the reuse
of valuable materials.
Pays: | UK |
N ° de modèle: | 008 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | UK |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | as per required |
Heure de livraison: | 10 to 15 days |
Capacité de Fournir: | - |
Payment Type: | T/T |
Groupe de produits : | - |