Prix FOB
Obtenir le dernier prix4500 ~ 5000 /
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
4500 ~ 5000 / Obtenir le dernier prix
Localité:
Lianyungang city, China
Prix de commande minimale:
4500
Commande minimale:
1 Piece
Packaging Detail:
pallets
Heure de livraison:
30 days
Capacité de Fournir:
100 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Mr. Elvis
A904 Shanshui Square, Cangwu Road, Lianyungang, Jiangsu
Top loading arms permit the transfer of liquids through the manhole on the top of a road or rail tanker. Depending on whether the product is dangerous or not, this connection may be open (manhole not sealed), semi-closed (via a cone to the top of the tanker) or closed. A closed connection indicates that the product is dangerous or toxic and made by a flange to the top of the tanker. Most often it is equipped with a cone and vapour hose to prevent the vapours from being released into the atmosphere. When top loading, operator safety is the number priority as the operator will be on top of the tanker. Working from height regulations must be followed during the process. Teampower also supplies a range of tanker access equipment to ensure this process is as safe as it can be. |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 4500 ~ 5000 / Obtenir le dernier prix |
Localité: | Lianyungang city, China |
Prix de commande minimale: | 4500 |
Commande minimale: | 1 Piece |
Packaging Detail: | pallets |
Heure de livraison: | 30 days |
Capacité de Fournir: | 100 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | - |