Prix FOB
Obtenir le dernier prix8000 / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
Model150x150x2, Model180x240x2, Model200x220x2, Model220x270x2
Prix FOB:
8000 / Set Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
8000 per Set
Commande minimale:
1 Set
Packaging Detail:
Plastic film for large parts and wooden case for small parts
Heure de livraison:
7-10 days
Capacité de Fournir:
100 Set per Month
Payment Type:
Money Gram, Western Union, T/T
Groupe de produits :
Model | HoleQty/hole diameter | Speed | Motor power | Remark |
---|---|---|---|---|
150x150x2 | 2*ï¿ 30(mm) | 1.21.4(m/min) | 5.5(kw) | Matching 50mm slab |
180x240x2 | 2*ï¿ 30(mm) | 1.21.4(m/min) | 5.5(kw) | Matching 80mm slab |
200x220x2 | 2*ï¿ 42(mm) | 1.21.4(m/min) | 7.5(kw) | Matching 90mm slab |
220x270x2 | 2*ï¿ 42(mm) | 1.21.4(m/min) | 7.5(kw) | Matching 120mm slab |
Firstly, Concrete batching machine start sand stone cement
assignment proportion procedure ,
After that materials can go into mixer machine to complete
mixing.
Next, mixed materials will drop into feeding dumper from the mixer
discharge port.
After that, feeding dumper will transport the materials to concrete
beam production bed.
There, materials will be dumped into the hopper of concrete beam
machine.
After that, Cement beam machine will start to work along the
rail.
Finally,the cement can come out, also the cutting machine can do
cut 24 hour later.
Pays: | China |
N ° de modèle: | Model150x150x2, Model180x240x2, Model200x220x2, Model220x270x2 |
Prix FOB: | 8000 / Set Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 8000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | Plastic film for large parts and wooden case for small parts |
Heure de livraison: | 7-10 days |
Capacité de Fournir: | 100 Set per Month |
Payment Type: | Money Gram, Western Union, T/T |
Groupe de produits : | Precast equipment |