Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Alice
Bantian, Shenzhen, Guangdong
Safety Precautions:
A) When the SPD is installed in final system, it must achieve
all the requirements of GB***3 (EN****0,   IEC****0)
standard;
B) The equipment has to be installed by authorized
professional person, before installation, to cut off power supply,
and prohibit hot-line work from accidents
C)  The load current of protected equipments should be
below *0A, or the product will cut off the power automatically,
only to push the black on  power line terminal
to recover.
ÂÂ
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |