Prix FOB
Obtenir le dernier prix0.1 /
|1000 Minimum Order
Pays:
China
N ° de modèle:
BBI-00987
Prix FOB:
0.1 / Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
0.1
Commande minimale:
1000
Packaging Detail:
Boxes
Heure de livraison:
20 Days
Capacité de Fournir:
500000 Piece per Month
Payment Type:
-
Groupe de produits :
Personne àcontacter Ms. Echo
Dongguan, Guangdong
|
ITEM |
TEST CONDITION AND REQUIREMENT |
1 |
High
Temperature |
After being
placed in a chamber with 802ºC for 96 hours and then being placed
in normal condition for 2 hours. |
2 |
Low
Temperature |
After being
Placed in a chamber with -302ºC for 96 hours and then being placed
in normal condition for 2 hours. |
3 |
Humidity Test |
After being
Placed in a chamber with 90-95% R.H. at 402ºC for 96 hours and then
being placed in normal condition for 2 hours. |
4 |
Temperature
Cycle |
The part shall
be subjected to 5 cycles. One cycle shall be consist
of:Â |
5 |
Drop Test |
Drop on a hard
wood board of 4cm thick, any directions ,6 times, at the height of
75cm . |
6 |
Vibration Test |
After being
applied vibration of amplitude of 1.5mm with 10 to 55 Hz band of
vibration frequency to each of 3 perpendicular directions for 2
hours . |
7 |
Solderability |
Lead terminals
are immersed in rosin for 5 seconds and then immersed in solder
bath of +3005ºC for 31 seconds . |
8 |
Terminal
Strength |
The force of
9.8N(1.0kg) is applied to each terminal in axial direction for 10
seconds. Â
|
Pays: | China |
N ° de modèle: | BBI-00987 |
Prix FOB: | 0.1 / Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 0.1 |
Commande minimale: | 1000 |
Packaging Detail: | Boxes |
Heure de livraison: | 20 Days |
Capacité de Fournir: | 500000 Piece per Month |
Payment Type: | - |
Groupe de produits : | Other Electronic Components |