Prix FOB
Obtenir le dernier prix( Negotiable )
|100 Meter Minimum Order
Pays:
China
N ° de modèle:
JDC-H
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
jiangsu China (mainland)
Prix de commande minimale:
-
Commande minimale:
100 Meter
Packaging Detail:
carton
Heure de livraison:
2-4 weeks
Capacité de Fournir:
120000 Meter per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter xia
No. 6, Baishuxia Community, Chunlei Residents' Committee, Xishan Economic Development Zone, Wux, Wuxi, Jiangsu
Insulated Conductors System JDC-H/Single pole conductor rail/Track Configuration: straight /curve elements available.
Single pole insulated conductor rails offers a large selection for different applications and number of poles.
Â
Standard application
data:
Max.current(A): **0 - **0 - **0
- **0 - ***0 - ***0
Max.voltage(V): **0 (hand safe array **0 V)
Conductor cross section(mm2):**0 - **0 - **0 - **0 - **0 - **0 - **0
Outside-Dimensions (Pol) [mm]: *9,0 x *5,0 / *4,0×*2,0 / *2,0×*2,0 / *8,0×*6,0
Leakage-distance(mm):*5 - *5(or *0) - *0
Resistance(Ω/km):0.***3 - 0.***2 - 0.***4 - 0.***3 - 0.***9 - 0.***6 - 0.***2
Â
Mechanical properties:
Flexible strength:*5N/mm2±*0%
Tensile strength:*0N/mm2±*0%
Temperature range:
Common Housing: **0oC up to **0oC
BAYBLEND Housing: **0oC up to ***5oC
Combustibility:
Flame retardant
Self extinguishing:class B *-no flaming paricles,self-extinguishing.
Standard application data
Operating Conditions: for indoor and weather protected outdoor applications
Special features
High availability in strong industrial enviroment trough several material
High level of safety trough insulation profiles with integrated finger safe protection
Easy and exact mountig with multiple hangr clamps for (3, 4 and 5 pol)
Free and unlimited combination for multiple amount of rails
On side bending with optional bending device for curves
possible
Â
Main applications
EOT cranes
People Mover
Special purpose equipment
Â
Maintenance
*-After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.
*-Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.
*-Every 3 up to max.*2 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.
Pays: | China |
N ° de modèle: | JDC-H |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | jiangsu China (mainland) |
Prix de commande minimale: | - |
Commande minimale: | 100 Meter |
Packaging Detail: | carton |
Heure de livraison: | 2-4 weeks |
Capacité de Fournir: | 120000 Meter per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | Insulated conductor rail sistems |