Prix FOB
Obtenir le dernier prix900 ~ 1200 USD / Metric Ton ( Negotiable )
|10 Metric Ton Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
900 ~ 1200 USD / Metric Ton ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
900 per Metric Ton
Commande minimale:
10 Metric Ton
Packaging Detail:
1 Mt silicon manganese/Jumbo bags
Heure de livraison:
Shipped in 7 days after payment
Capacité de Fournir:
5000 Metric Ton per Month
Payment Type:
Western Union, L/C, T/T
Groupe de produits :
Personne àcontacter David
Qingdao, Shandong
Silicon manganese is composed of manganese, silicon, iron and other elements with a small amount of carbon and other kinds of alloy. It is widely used with a large production.
ÂÂ Â
ÂSilicon in Silicon-manganese has strong affinity with manganese and oxygen. Deoxidation products MnSiO 3 & MnSiO4 produced in the steelmaking procedure has a temperature of ***0°C and ***7°Crespectively. They both have the advantages such as a low melting point, large particles, easy floating, and good deoxidization effect etc.
ÂÂ Under the same conditions, the burning loss rates of silicon and manganese were *6% and *7% respectively. But with the silicon-manganese alloy, the burning loss rate is *9%. Therefore, it is widely used in steelmaking industry and has become the essential deoxidizing agent and additive in steelmaking industry.
ÂSilicon manganese which content has a low carbon content by 1.9% is the semi-finished product used in low carbon ferromanganese and electro silicothermic metal.
Â
Grade |
Â
Si |
Â
Mn |
Â
C |
Â
P |
Â
S |
Â
FeMn*5Si*7 |
Â
****9 |
Â
*5.***8.0 |
Â
2.5 |
Â
0.*5 |
Â
0.*4 |
Â
FeMn*0Si*4 |
Â
****6 |
Â
*0.***3.0 |
Â
2.5 |
Â
0.3 |
Â
0.*5 |
Â
FeMn*0Si*2 |
Â
****4 |
Â
*8.***2.0 |
Â
2.5 |
Â
0.5 |
Â
0.*6Â Â
Â
|
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 900 ~ 1200 / Metric Ton ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 900 per Metric Ton |
Commande minimale: | 10 Metric Ton |
Packaging Detail: | 1 Mt silicon manganese/Jumbo bags |
Heure de livraison: | Shipped in 7 days after payment |
Capacité de Fournir: | 5000 Metric Ton per Month |
Payment Type: | Western Union, L/C, T/T |
Groupe de produits : | Metals |