Prix FOB
Obtenir le dernier prix3000 ~ 6000 USD / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
bf51
Prix FOB:
3000 ~ 6000 USD / Set Obtenir le dernier prix
Localité:
china
Prix de commande minimale:
3000 per Set
Commande minimale:
1 Set
Packaging Detail:
wooden
Heure de livraison:
15
Capacité de Fournir:
5 Set per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Groupe de produits :
1. The structure and working principle of hydraulic transmission
and components;
2. Demonstration control experiment of hydraulic bulldozing
machinery;
3. Demonstration control experiment of hydraulic bulldozer
4. Shoveling action of hydraulic bulldozer;
5. Earth-moving action of hydraulic bulldozer;
6. Unloading action of hydraulic bulldozer;
7. The hydraulic bulldozer returns when it is empty;
Pays: | China |
N ° de modèle: | bf51 |
Prix FOB: | 3000 ~ 6000 / Set Obtenir le dernier prix |
Localité: | china |
Prix de commande minimale: | 3000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | wooden |
Heure de livraison: | 15 |
Capacité de Fournir: | 5 Set per Month |
Payment Type: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal |
Groupe de produits : | Engineering teaching equipment |