Building Construction Scaffold Steel Plank with High Quality By Adto Group,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Building Construction Scaffold Steel Plank with High Quality Building Construction Scaffold Steel Plank with High Quality Building Construction Scaffold Steel Plank with High Quality Building Construction Scaffold Steel Plank with High Quality Building Construction Scaffold Steel Plank with High Quality
Next

Building Construction Scaffold Steel Plank with High Quality

600 ~ 800 / Ton

|

100 Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

600 ~ 800 / Ton Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

600 per Ton

Commande minimale:

100

Packaging Detail:

In pallet or in bulk

Heure de livraison:

10-30 days after receiving depoist or LC

Capacité de Fournir:

20000 Ton per Month

Payment Type:

T/T, L/C

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Ailiang

renming dong road, Changsha, Hunan

Contacter maintenant

La description

~ Building Construction Scaffold Steel Plank with High Quality
 
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).
 
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
 
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.
 Size (MM)
~WALK BOARDS
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *5 x 1.2 x ***0
~**0 x *0 x 1.2 x ***0
~**0 x *0 x 1.2 x ***0
~CATWALK
~**0 x *0 x 1.2 x ***9
~**0 x *5 x 1.2 x ***9
~**0 x *5 x 1.2 x ***9
~**0 x *8 x 1.2 x ***9
~**0 x *5 x 1.2 x ***9
~**0 x *0 x 1.2 x ***9
~**0 x *5 x 1.2 x ***9
~**0 x *5 x 1.2 x ***9
~**0 x *8 x 1.2 x ***9
~**0 x *5 x 1.2 x ***9

Products:
galvanized scaffolding plank.jpg
galvanized scaffolding steel plank.jpg
scaffolding board**8
Why Us:
 
Xiangjia Steel is a leading manufacturer of scaffolding Galvanized Base Jack, system scaffoldings and accessories,galvanized steel pipe,Frames,steel props, metal planks and other related products.

• 7 years experience, sales volume reaches 1.5 billion US dollars.
• Good quality control in production process, ISO***1:***8,SGS,BV approved.
• Excellent quality and Competitive price, OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.
• Our factory is close to the port-Xingang,Tianjin.

Main Buying Procedures:
 
• Enquiry: contact us by email, phone call, fax, Instant tools (Trademanager, MSN, Skype) and let us know your enquiry.
• Discussion: specify the items you want, confirm specification.
• Quotation: Prices offered and accepted.
• Place order as per contract or discussion.
• Proforma invoice offered to double confirm the order for both sides record.
• Payment settled.
• Order completed under our arrangement.
• Goods shipped as per contracted term.
• Goods arrive at local port or warehouse, depending on contracted term.
• Support & re-ordering.
 
Our Service:
 
• Your inquiry related to our product & price will be replied within *4hours.
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
• Working time: 8:*0am - 5:*0pm, Monday to Friday.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question.
 
Suggestion:
 
Please kindly check the packages after you receive the goods, if you got wrong productsbquality problem/ short q'ty, please get back to us as priority. Please note that you need to send us pictures of the defective items concerning this, and we will consider to replace or refund accordingly.
 
We also Supply:
 
Galvanized Base Jack, Ringlock scaffolding system, Adjustable steel props, Adjustable screw jack, Frame system, Metal plank, Scaffolding coupler& accessories, Cuplock scaffolding system etc.
Frame system in formwork.jpg Ringlock 8.jpg

 

Pays: China
N ° de modèle: -
Prix FOB: 600 ~ 800 / Ton Obtenir le dernier prix
Localité: -
Prix de commande minimale: 600 per Ton
Commande minimale: 100
Packaging Detail: In pallet or in bulk
Heure de livraison: 10-30 days after receiving depoist or LC
Capacité de Fournir: 20000 Ton per Month
Payment Type: T/T, L/C
Groupe de produits : scaffold

Send a direct inquiry to this supplier

To:

Ms. Ailiang < Adto Group >

Je veux savoir: