Prix FOB
Obtenir le dernier prix100 ~ 150 USD / Piece ( Negotiable )
|1000 Piece Minimum Order
Pays:
Pakistan
N ° de modèle:
-
Prix FOB:
100 ~ 150 USD / Piece ( Negotiable )Obtenir le dernier prix
Localité:
Pakistan
Prix de commande minimale:
100 per Piece
Commande minimale:
1000 Piece
Packaging Detail:
Box
Heure de livraison:
30
Capacité de Fournir:
10000 Piece per Month
Payment Type:
L/C, T/T
Groupe de produits :
-
Pakistan
GENERAL
M and
B Manufacturing Arc Strangler switch blade load breaking device is
a specialized tool used primarily in electrical maintenance and
safety. Here are some key points about it:
Functionality:Designed
to safely disconnect power from electrical circuits, it allows for
the isolation of electrical loads while minimizing the risk of
arcing or other electrical hazards.
Construction: Typically made from durable, insulated material
to ensure safety during operation. It may feature ergonomic grips
for ease of use.
Application: Commonly used by utility workers and
electricians when performing maintenance or repairs on live system.
It helps ensures that workers can safely manipulate load
connections without exposing themselves to high voltage.
INSTALLATION
Installing a load breaking switch blade involves several steps to
ensure safety and proper functionality. Heres a general guide to
help you through the process:
Tools and Materials Needed
• Load breaking switch blade
• Insulated tools
• Safety gear (gloves, goggles, etc.)
• Mounting hardware
• Electrical connectors
• Torque wrench
• Voltage tester
Installation Steps
1. Safety First:
o Ensure all power is disconnected before beginning
installation.
o Use appropriate personal protective equipment (PPE).
2. Prepare the Installation Area:
o Clear the area of any debris and ensure its dry.
o Verify that the mounting location is suitable and complies with
local regulations.
3. Mount the Switch Blade:
o Securely mount the load breaking switch blade to the designated
structure or pole using the provided hardware.
o Ensure its level and properly aligned.
4. Connect the Electrical Wiring:
o Use a voltage tester to confirm that no voltage is present.
o Connect the incoming and outgoing conductors to the switch blade
terminals, ensuring proper polarity.
o Tighten connections using a torque wrench to the manufacturers
specified torque settings
Â
Pays: | Pakistan |
N ° de modèle: | - |
Prix FOB: | 100 ~ 150 / Piece ( Negotiable ) Obtenir le dernier prix |
Localité: | Pakistan |
Prix de commande minimale: | 100 per Piece |
Commande minimale: | 1000 Piece |
Packaging Detail: | Box |
Heure de livraison: | 30 |
Capacité de Fournir: | 10000 Piece per Month |
Payment Type: | L/C, T/T |
Groupe de produits : | - |