Acrylic acid synthetic tennis court By GuangZhou jin hong sport equipments co., ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Acrylic acid synthetic tennis court
Next

Acrylic acid synthetic tennis court

|

1000 Square Meter Minimum Order

Pays:

China

N ° de modèle:

AC

Prix FOB:

Localité:

gaungzhou

Prix de commande minimale:

-

Commande minimale:

1000 Square Meter

Packaging Detail:

5 Gallon/barrel & 55 Gallon/barrel

Heure de livraison:

7 days after deposit

Capacité de Fournir:

8 Ton per Day

Payment Type:

T/T, Western Union

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter tannie

jiang gao, Guangzhou, Guangdong

Contacter maintenant

Spécification du produit

La description


Acrylic acid synthetic tennis court

Required Materials
   The materials used for the   ColorPlus System for Concrete Substrate are as follows:
   Primer
   Level Master
   Coat
   For detailed products information consult the individual Specifications.
2.Application of Primer
  It is suggested to apply only 1 coat of Primer.
  The undiluted coverage rate is approximately 0.*5kgs per square meter,per coat.
  The practical quantity depends on the smoothness of the surface.
3.Application of Level Master
  It is suggested to apply minimum 2 coats of   Level Master.
  The undiluted coverage rate is approximately  0.*5kgs per square meter, per coat.
  The practical quantity depends on the smoothness of the surface and the different sizes      of the added sand. 
4.Application of Coat
  the previous two coats is incorporated with sand (texture coat), the third coat can be       applied directly (finish coat).
  The undiluted coverage rate for the texture coat is approximately added with sand: 0.2kgs    per square meter, per coat, added with   Base: 0.**6kgs per square meter, per coat, while    the undiluted coverage rate for the finish coat is approximately 0.*5kgs per square          meter, per coat.
  The practical quantity depends on the different sizes of the added sand. 
5.Application of Line Paint
  It is suggested to apply 1 coat of Line Paint.
  Approximately 3.*5kgs is needed for a standard tennis court.
6.Completion
  Courts can only be put into use after *4 hours when the work comes to an end.
  Upon completion, the constructor shall insure proper removal of all construction debris, 

  surplus materials, empty containers and wash water, and shall leave the site in a   condition     

  acceptable to the owners.
  The court is to be left secure so as to prevent vandalism.

Pays: China
N ° de modèle: AC
Prix FOB: Obtenir le dernier prix
Localité: gaungzhou
Prix de commande minimale: -
Commande minimale: 1000 Square Meter
Packaging Detail: 5 Gallon/barrel & 55 Gallon/barrel
Heure de livraison: 7 days after deposit
Capacité de Fournir: 8 Ton per Day
Payment Type: T/T, Western Union
Groupe de produits : -

Send a direct inquiry to this supplier

To:

tannie < GuangZhou jin hong sport equipments co., ltd >

Je veux savoir: