AB eopxy putty By Zhejiang Tianhe Resin Co., Ltd.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
AB eopxy putty
Next

AB eopxy putty

|

- Minimum Order

Pays:

China

N ° de modèle:

epoxy B

Prix FOB:

Localité:

-

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

-

Heure de livraison:

-

Capacité de Fournir:

-

Payment Type:

-

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Peter

Xianrentun, Linhai, Zhejiang

Contacter maintenant

Spécification du produit

  • Brand Name: TBD
  • Type: HMS Scrap
  • Composition: Ferrous Steel Scrap
  • Application: Melting
  • HMS Type: HMS 1 & 2

La description

Use 1. Stone material dry-applying in binding; 2. Structural Reinforcement; 3. Bridge, construction, connection of prefabs of highway etc. Use Method 1. Clean the surface to be bound; 2. Blend the group A and group B according to 2:1 to 1:1 ratio; 3. Apply the glue with steel scrapers or other tools. Matters needing attentions 1. Heavy load is not allowed at the initial stage of the solidification of the dry-applying glue; 2. If the surface to be bound is too smooth, the rough treatment should be conducted firstly; 3. The effective time after the blending is ****5 min; 4. The initial solidifying time is ****0 min and after *4 hr the solidification is complete. 5. Please do not put the remained glue after the blending back to the original pail. Storing Stored at dry and ventilated places with the shelf life of *2 month. Packing and Specifications Packed in plastic pots with the specifications of 1 L, 5 L and *0 L etc. Use 1. Stone material dry-applying in binding; 2. Structural Reinforcement; 3. Bridge, construction, connection of prefabs of highway etc. Use Method 1. Clean the surface to be bound; 2. Blend the group A and group B according to 2:1 to 1:1 ratio; 3. Apply the glue with steel scrapers or other tools. Matters needing attentions 1. Heavy load is not allowed at the initial stage of the solidification of the dry-applying glue; 2. If the surface to be bound is too smooth, the rough treatment should be conducted firstly; 3. The effective time after the blending is ****5 min; 4. The initial solidifying time is ****0 min and after *4 hr the solidification is complete. 5. Please do not put the remained glue after the blending back to the original pail. Storing Stored at dry and ventilated places with the shelf life of *2 month. Packing and Specifications Packed in plastic pots with the specifications of 1 L, 5 L and *0 L etc.

Pays: China
N ° de modèle: epoxy B
Prix FOB: Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: -
Packaging Detail: -
Heure de livraison: -
Capacité de Fournir: -
Payment Type: -
Groupe de produits : -

Mots-clés correspondants Zhejiang Tianhe Resin Co., Ltd.

Send a direct inquiry to this supplier

To:

Mr. Peter < Zhejiang Tianhe Resin Co., Ltd. >

Je veux savoir: