Prix FOB
Obtenir le dernier prixUSD ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
AB-20
Prix FOB:
USD ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
factory installed with wooden case
Heure de livraison:
16 days after deposit
Capacité de Fournir:
200 Set per Month
Payment Type:
T/T, L/C, PayPal
Groupe de produits :
-
Personne àcontacter Cindy
Cao'e Street, Shangyu,Zhejiang,China, Shaoxing, Zhejiang
*0Ton Marley Cooling Tower With Top Quality
Â
Name: | *0Ton Marley Cooling Tower With Top Quality |
Type: | AB**0 |
Unit: | Set          Marley Cooling Tower |
Material: | FRP |
Usage: | For air-condition, injection molding,tan, foaming, Electricity generation,steam turbine and so on. |
Fan Diameter |
**0mm(*9.9") |
Motor power |
**0w(0.5hp) |
Max outer diameter | ***0mm(*5.1") |
Tower height | ***0mm(*0.1") |
Net weight | **0kg |
Operating weight | **0kg |
Water inlet diameter | *0mm(1.9") |
Water outlet diameter | *0mm(1.9") |
Brand Name: | Aosua |
Place of rigin: | Zhejiang,China |
Minimum Order: | 1 set |
Packaging Details: | Factory installed with wooden case |
Terms of payment: | TT |
Sample delivery time: | **8 days for spare parts |
Supply Ability: | **0 sets/month |
Production date: | *6 days after deposit |
Pays: | China |
N ° de modèle: | AB-20 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | factory installed with wooden case |
Heure de livraison: | 16 days after deposit |
Capacité de Fournir: | 200 Set per Month |
Payment Type: | T/T, L/C, PayPal |
Groupe de produits : | - |