Prix FOB
Obtenir le dernier prix|
1 Unit Minimum Order
Pays:
China
N ° de modèle:
CK-2HAL-S
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Unit
Packaging Detail:
40HQ container (3 units)
Heure de livraison:
35 days after receiving deposit
Capacité de Fournir:
30 Unit per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Ms. Ellian
Jingshi Road, Jinan, Shandong
Model |
 CK*2HAL-S |
Materials |
Chassis Material: double hot dip galvanized RHS (3.5mm*4.0mm) |
Frame Material: double hot dip galvanized RHS (2.5mm) |
|
Body Panel: galvanized sheet (1.2mm) |
|
Roof: Special molded FRP |
|
Brake |
Perfect security structure design, double axle electric brakes |
Drawbar |
Drawbar Checker Plate 1.2mm aluminium |
Drawbar Safety Chain two & Bracing Wheel one |
|
Suspension |
Roll rocker tandem spring 5 plate |
Axles |
Two special trailer axles |
Wheels & Tyre |
Five **5R*4C tyres and *4’ aluminum alloy rims including a spare wheel |
Rubber Matting |
*8mm special plywood for floor& ramp door |
Rubber Matting For Inner Side Panel           6mm Rubber Matting |
|
Rubber Matting For Floor & Ramp Door     *7.5mm&*0mm Rubber Matting |
|
Mudguard |
Extended Mudguard |
Mudguard checker plate 1.2mm aluminium in the front of mudguard |
|
PEDAL & ALUMINIUM STEP 1.2mm aluminium decoration board |
|
Windows& Doors |
Front Window (mm) ***0***0 |
Side Windows  |
|
Pays: | China |
N ° de modèle: | CK-2HAL-S |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Unit |
Packaging Detail: | 40HQ container (3 units) |
Heure de livraison: | 35 days after receiving deposit |
Capacité de Fournir: | 30 Unit per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | two horse trailer |