Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
ZJ50 drilling rig
Next

ZJ50 drilling rig

|

1 Minimum Order

Pays:

China

N ° de modèle:

QJ250-1 Filling Pile Drilling Equipment

Prix FOB:

Localité:

china

Prix de commande minimale:

-

Commande minimale:

1

Packaging Detail:

export packing

Heure de livraison:

In stock

Capacité de Fournir:

100 Set per Year

Payment Type:

Western Union, L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Ms. May

Anshun East Zone, 2288 Dongfeng East Street, Weicheng Distric, Weifang, Shandong

Contacter maintenant

La description

ChinaFar Eastern Drilling Spare Parts (Industry) Co., Ltd.specializes in oilfield equipment.which is a big drilling equipments manufacturing base in China, we supply different kinds of oilfield equipment including drilling equipment, workover equipment and production equipment. As a great supplier of quality oilfield equipment to the oil and gas industry, we ship our products around the world.

● coupling is the use of diesel + car + belt and the form of cars and pump-driven winch.
● reasonable force distribution, power utilization high.
● within the variable-speed winch, the use of non-stop machine clutch transmission, the realization of the four is the second of six stalls down.
● the main brake is hydraulic disc brake, auxiliary brake is electromagnetic eddy current brake.
● Modular design, reasonable layout. Host module, "Former high low" of the layout. To achieve low power and transmission installed.
● fishing with sand drum, mechanical friction and the wheel drive Oxytropis. Modular design, mature technology, to facilitate disassembly.
● ***0m drilling rig above the host of "after the former high-low" mode layout, low power and drive system installation, through the bevel gear box and cardan shaft to send power to the drilling units and Oxytropis winch wheel drive.
● drill motor can be automatically sent to the allocation of self-drilling system, top drive drilling and installation, with the overall mobile slide Cong meet when drilling wells between the migration requirements.
● gas, electricity, hydraulic control, drilling parameters and display a unified dashboard layout, with an independent driller control room


Technical Parameters
Model :ZJ*0
Kw Power:***0
Speed:4F*2R
Main Brake:Hydraulic disc brake or belt brake
Auxiliary Brake:Eddy brake 
Crown Block:TC***5
Traveling Block hook:YG***5
Swivel:SL***0
Rotary Table:ZP***5
Derrick Type:K
Derrick Height,m:*5
Derrick max.hood load,KN:***0
Substucture Type:Raised Floor
Substucture Height of drilling floor,m:7.5
Substucture  clear height,m:6.3
Mud Pump Type:F****0*2
Mud Pump Drive mode:Belt Compound drive
installation force,Kw:**0*3



We process our Drilling Rig strictly according to API standard and ISO********0 standard, for which good quality and good prices can be assured to you.If you have any interest in our products, please contact us offer.machinery(at)gmail(dot)com 
 

Pays: China
N ° de modèle: QJ250-1 Filling Pile Drilling Equipment
Prix FOB: Obtenir le dernier prix
Localité: china
Prix de commande minimale: -
Commande minimale: 1
Packaging Detail: export packing
Heure de livraison: In stock
Capacité de Fournir: 100 Set per Year
Payment Type: Western Union, L/C, T/T
Groupe de produits : Drilling Rig

Send a direct inquiry to this supplier

To:

Ms. May < CHINA FAR EASTERN INDUSTRY CO., LIMITED >

Je veux savoir: