La description
Features
1ã€Intelligent controlled by industrial MCU
2ã€Multiple control modes for load, such as light
control, light-timer control, and manual control..
3ã€Wind-Solar complementary charge
and control.
4ã€Increase generation efficiency
byboosting the charge voltage
into a secondary power storage, to
save more power in breeze circumstance.
5ã€PWM charging, a scientific battery management
system
6ã€LEDs and *-segment display the real-time
status of the controller
7ã€Multiple battery protections against overcharge,
overdischarge, overload, short circuit and reverse
8ã€Self-adapt *2V/*4V battery management system.
(For lead-acid battery only, lithium battery is
forbidden.)
9ã€Electromagnetic brake and power unloading to
protect the wind generator and the battery
Functions
1ã€Self-adapt *2V/*4V battery management system.
Connect the controller to a *2V battery, and push the Power
Switch , the *-segment will auto show “1” ( or “2” for to
the *4V one) in first 5 secs .
2ã€Voltage step-up charge. The controller will
step-up the charge voltage to ****8V automatically when the
output voltage of the wind generator is lower than *2V or *4V in
breeze circumstance.
3ã€Electromagnetic brake and power
unloading. The controller will start the brake and power
unloading protection when the output voltage of the wind
generator is over *2V or *4V.
4ã€LED indication.
A〓CHARGE” Indicator. It will be ON when apply the
controller an voltage(from wind generator or solar panel),
and OFF when no Voltage, and flash slowly when the battery
is charged, and flash
quickly when the battery is overcharged and the
charging circuit will be
opened.
B〓BATTERY” Indicator. It will be ON when the battery
voltage is normal, FLASH SLOWLY when the battery is
under-voltage, FLASH QUICKLY when the battery is over discharged
and the load will be cut off.(The load will be resumed when the
battery voltage is recovered to *2.5V)
C〓OUTPUT”Indicator. It will ON when the load is working
and OFF when no load, FLASH SLOWLY when over current (The load
circuit will be cut off *0 seconds later when the current is 1.*5
times the rated current or 5 seconds later when the current is
1.5 times the rated current, LED will keep flashing slowly),
FLASH QUICKLY when the load is short circuit and load circuit
will be cut off. Other functions will not be affected even the
load circuit is cut off.
5ã€Multiple Control Modes.
Aã€Light
control. When there is no
sunlight, load circuit will be closed within 3 minutes . When
there is sunlight, load circuit will be opened within 3
minutes.
Bã€Ligh-Timer control. A plus timer-control function based on the
Light-control function above. That is, the controller starts
timing as soon as the load circuit closed, and opens the load
circuit as soon as your desired preset time is up
Cã€Manual
control.
Close/Open the load circuit by
pushing the “Function Select” .
Dã€Quick
Check.
Load circuit will be opened when the
controller gets a charge voltage, and closed otherwise. This is a
shortcut to check the controller’s & output if
functioning properly.
Eã€Always-on mode. The load circuit is closed always.
PS: A solar panel is necessary in
the light control mode and in the light-timer control
modes
Mode Setting
1ã€Press the
“Function Select” and hold on for more than 2 seconds, the
*-segment will flash and the controller is under the
condition of mode setting.
2ã€Then
press the “Function Select” to select the mode you want,
and press it again for 2 seconds long to confirm your setting,
the will stop flashing and indicates the mode you have selected
for 2 seconds.
3ã€If you
want to check which kind of mode you have set before, press the
“Function Select” for less than 2 seconds, the
*-segment will ON and indicates the mode that has been
set.
Installation 1ã€Prepare
wire. Choose wire that is matching with the current.
2ã€Connect
battery. Don’t reverse the polarity. 3ã€Connect
solar panel. Don’t reverse the polarity. 4ã€Connect
wind generator. Connect three wires of the turbine to the A,B,C
ports of the controller. 5ã€Connect
load. Connect the load to the “Output” port, don’t reverse the
polarity, make sure the maximum output current is under the rated
current. 6ã€Turn on the
controller and set the control mode you want.
Uninstallation
1〠turn
off the controller 2〠disconnect
the wind generator 3〠disconnect
the solar pannel 4〠disconnect
the battery
Pays: |
China |
N ° de modèle: |
JDX-10A/500
|
Prix FOB: |
50 / Piece (Negotiable)
Obtenir le dernier prix
|
Localité: |
Jiangmen,Guangdong,China |
Prix de commande minimale: |
50 per Piece |
Commande minimale: |
10 Piece |
Packaging Detail: |
carton for export |
Heure de livraison: |
30 days |
Capacité de Fournir: |
500 Piece per Month |
Payment Type: |
L/C, T/T |
Groupe de produits : |
Wind-Solar Generating System Component
|