Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
DF204
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
iron frame
Heure de livraison:
45 days
Capacité de Fournir:
1000 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Anny-cn.kudat88.072658
Room 401-3, E 1 buildingEast Lake High-Tech ,Development Zone, Wuhan, Hubei
Tractor |
Model |
DF***4 |
|||
Drive Type |
4WD |
||||
Overall Dimensions L×W×H (mm) |
***0×***0×***0 Height steering wheel |
||||
Wheel Track(mm) |
Front |
**4 |
|||
Rear |
***0,***0,***0,***0 |
||||
Wheel Base(mm) |
***8 |
||||
Ground |
Under Front Axle |
**2 |
|||
Under Rear Axle |
**0 |
||||
Rated Traction |
In Paddy Fields |
***5 |
|||
In Dry Fields |
***0 |
||||
Construction Mass(Kg) |
***0 |
||||
Min. Turning Radius(m) |
2.*0 |
||||
Theoretical |
Forward |
1.*1,1.*9,2.*0,5.*6,5.*5,9.*6,*5.*2,*6.*0 |
|||
Reverse |
1.*4,7.*5 |
||||
Engine |
Model |
Y**0T |
|||
Type |
*-cylinder,Upright inline cylinder, radiator cooling,*-storke cycle |
||||
**-hour Rated Power(Kw/hp) |
*4.7/*0.0 |
||||
Rated Speed(rpm) |
***0 |
||||
Bore×Stroke(mm) |
*0×*0 |
||||
Total Displacement(L) |
1.**5 |
||||
Drive |
Clutch |
Dual-stage |
|||
Gear Box |
(4*1)×2 |
||||
Main Drive |
One Pair of Spiral Bevel gears |
||||
Differential |
Bevel Gear |
||||
Differential Lock |
Jaw Lock |
||||
Final Transmissions |
Spur Gear,External Gearing |
||||
Travelling |
Tyre |
front |
6.****2(herringbone pattern) |
||
rear |
8.***4(herringbone pattern) |
||||
Steering Gear |
Full Hydraulic steering |
||||
Brake |
Disk type |
||||
Working |
Hydraulic |
Lifting Capacity at **0 mm Behind Lift Point(Kg) |
**2kg |
||
*-point Suspension |
Category:I |
||||
P.T.O.Shaft |
Rotating Speed(rpm) |
**0/***0 |
|||
Spline size |
*-φ*5 Rectangular spline |
Pays: | China |
N ° de modèle: | DF204 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | iron frame |
Heure de livraison: | 45 days |
Capacité de Fournir: | 1000 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | agricultural equipment |