Prix FOB
Obtenir le dernier prix10 ~ 100 / Set ( Negotiable )
|10 Set Minimum Order
Pays:
China
N ° de modèle:
JH-LS
Prix FOB:
10 ~ 100 / Set ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
10 per Set
Commande minimale:
10 Set
Packaging Detail:
Packed by wooden bars, crates, metal stripes, films for bulk goods, and cartons for accessoires. 2.
Heure de livraison:
15 days for 1*20GP; 20 days for 1*40GP container
Capacité de Fournir:
4000 Ton per Month
Payment Type:
T/T, L/C, D/P, Western Union
Groupe de produits :
Personne àcontacter Ms. Lisa
No. 22, Ankang Road, Guli Industry District, Jiangning Area, Nanjing, Jiangsu
Warehouse storage rack manufacturer for
storage: Adopt the structure that the beam hitching on the
frame, the beam can be easily adjusted by step of *0mm.
This kind of rack is suit of more bearing and longer beams,
usually the bearing between **0kg and **0kg. The layer can be steel
plate or wood plate logs of wood, MDF, particle board with plastic
etc.
Shelving structure:
1, Columns are made from cold rolled steel, its positive
double punch holes, hole distance *0mm, hole used to mount the
beam columns for use; column connecting pipe pieces include
horizontal, inclined connecting pipe, the two column and all the
bolt root.
2, Beams with "P"-type pipe, commonly known as "ladder beam", step height and the height of laminate to match.
3, The steel plate cold rolled steel plate bending forming four sides of the desired sizes.
4, The beams and columns into the framework of the film mount assembly, and finally the laying of steel plate.
5, The shelf parts good shape after processing all polished, acid, phosphate, automatic powder coating, drying process finished after assembly .
   The surface of the shelf products to produce clean, beautiful; shelves up and down by *0mm pitch layer can be adjusted, to facilitate entry.
MainFrame:
Two frames (one frame: Add a few horizontal pull the two
cable-stayed columns.)
Beam (one layer have two beams.) Shelves (shelves are placed on top of two beams.)
Subframe:
One frame (a frame: Add a few horizontal pull the two
cable-stayed columns.) beam (layer have two beams.) Shelves
(shelves are placed on top of two beams.)
Longspan shelving scope:
1, It usually for small parts, heavy goods storage, the default load-bearing layer in the **0kg***0kg range.
2, It is widely used in human, manual handling, storage and
selection operations based on various occasions such as storage
and display.

Pays: | China |
N ° de modèle: | JH-LS |
Prix FOB: | 10 ~ 100 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 10 per Set |
Commande minimale: | 10 Set |
Packaging Detail: | Packed by wooden bars, crates, metal stripes, films for bulk goods, and cartons for accessoires. 2. |
Heure de livraison: | 15 days for 1*20GP; 20 days for 1*40GP container |
Capacité de Fournir: | 4000 Ton per Month |
Payment Type: | T/T, L/C, D/P, Western Union |
Groupe de produits : | Longspan shelving |