Prix FOB
Obtenir le dernier prix|
10 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
10 Piece
Packaging Detail:
-
Heure de livraison:
15 days
Capacité de Fournir:
5000 Piece per Month
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. michael
Xiamen, Fujian
Â
Drive-in pallet rack information:
 Model |  Heavy Duty Powder Coating Drive In Racking |
 Main Parts |  Frame, beam, Connect Arm, Support rail, Bracer and Post Protector |
 Load Capacity |  ***0kg/pallet |
 Surface Treatment |  Powder Coating |
 Advantage |
 1. LIFO(last in first out) /FIFO(first in first out)
configurations; 2. Better use of floor area and height space;3. Designed around the combination of your pallets and forklifts |
 Color |  Blue/Orange or as your requirement |
 Delivry Time |
 within *5 days for the ordinary quantity;
 ÂBig qty will make a special arrangement as your schedule |
Â
Drive-in pallet rack Packaging & Shipping
Â
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 10 Piece |
Packaging Detail: | - |
Heure de livraison: | 15 days |
Capacité de Fournir: | 5000 Piece per Month |
Payment Type: | - |
Groupe de produits : | - |