Valve special CNC boring machine By Shenyang Billon Technology Group,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Valve special CNC boring machine
Next

Valve special CNC boring machine

|

- Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

Localité:

-

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

-

Heure de livraison:

-

Capacité de Fournir:

-

Payment Type:

-

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Amanda

NO.1 China machine tool city,36-1 Hongrun Road,Yuhong District, Shenyang,China, Shenyang, Liaoning

Contacter maintenant

Spécification du produit

La description

Billon valve special CNC boring machine can process the valve flange parts ,  tapping bore, sealing surface . CNC rotary table can complete all the machining of the valve by one clamping .

Suitable range:

Processing of valve flange, cylindrical face , line ,etc.

Features:
 

  1. Good shock absorption and rigidity.
  2. Fully enclosed electrical cabinet with air design increased the dustproof ventilation cooling effect .
  3. With Taiwan library CAM manipulator knife, the machine has safe and reliable performance and high speed to change knife.
  4. Machine tool uses Japanese NSKP4 level precision bevel bi-directional ball bearing preloaded installation ,which makes the machine no noise in operation.
  5. Taiwan high precision spindle and with heat treatment , it can make up to *0kg/mm2 . At the same time ,the spindle is equipped with four front axle and two rear axle to guarantee the spindle rigidity and precision under high speed.

After-sale services:
 
  1. We provide fault repair response service for *4 hours a day . We will provide one hour telephone response firstly ,after receiving user service .When we cant solve the problem in the phone, we will arrive within *4hours , and solve the problem on the arrival day .
  2. During the warranty period , if spare parts of the equipment we provided need to be changed , we will provide spare parts of the same quality and performance within 3 working days to ensure its normal operation .
  3. We will take the responsibility for any damage due to the quality during the warranty period. Users need to pay no expense for the warranty .

Pays: China
N ° de modèle: -
Prix FOB: Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: -
Packaging Detail: -
Heure de livraison: -
Capacité de Fournir: -
Payment Type: -
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Ms. Amanda < Shenyang Billon Technology Group >

Je veux savoir: