Prix FOB
Obtenir le dernier prix3 ~ 8 USD / Kilogram ( Negotiable )
|10000 Kilogram Minimum Order
Pays:
Turkey
N ° de modèle:
-
Prix FOB:
3 ~ 8 USD / Kilogram ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
3 per Kilogram
Commande minimale:
10000 Kilogram
Packaging Detail:
wooden box
Heure de livraison:
Max.30 days after payment recieved
Capacité de Fournir:
60000 Kilogram per Month
Payment Type:
L/C, T/T
Groupe de produits :
Turkey
Personne àcontacter Mr. Kadir
T.Ziyaeddin Cd.No:31, Konya, Konya
Omeroglu Metalurji have involved iron, ductile (nodular) iron and
steel casting business since 1991.Our company owner's exprience on
casting business is for more then 40 years.Our product are
agricultural equipment parts, automotive parts, valves, elevator
system and machinery parts and etc.We are casting agricultural
machinery parts such as gearbox bodies, frontal covers, rear
covers, rods, gears, valve bodies, bonnets, flanges, stems for
world renowned Turkish companies.Our casting capacity per unit is
between 1 kg to 5 tons.We want to help you for your machine parts
and other casting products with our quality and experience. Our
manufacturing schedule is here below, Manufacturing Schedule; Our
typical manufacturing schedule starts with the recieving order from
our customers. According to the order , it requires to prepare the
raw materials such as pig iron, scrap steel etc. And also requires
manufactured materials such as cores. So pattern and core boxes
which has been sent from our customers are prepped for the
production. Core room starts working first, and gets cores ready
for molds which are being made.Meanwhile mold halves ( upper and
lower ) are made and placed to the assembly area.At the assembly
area, molds are flow coated and cores are set in place. The mold is
then closed up for pouring. After molds are staged on line, melted
raw materials with our electircal induction furnace brougth to the
molds and pouring process starts. Once poured, the molds are
allowed to cool before next being sent to the shakeout. At the
shakeout, the castings are separated from the sand mold. The sand
is sent to a reclamation system so that it can be reused in the
molding process.After shakeout is done, castings are sent to the
cleaning room where they are prepared for costumers specifications.
Processing in the cleaning room includes shot blasting, cut-off,
welding, heat treating and inspection. 1-Receving order
2-Schedule
   a)Core Making
      a-1)Molding
         a-1-a)Flow
Coat
        Â
a-1-b)Assembly
   b)Melting
      b-1)Spectro
3)Pouring and Shakeout
4)Cleaning room
   a)Shot-blast
   b)Cut-off
   c)Welding
   d)Grinding
   e)Inspection
   f)Heat treatment
Pays: | Turkey |
N ° de modèle: | - |
Prix FOB: | 3 ~ 8 / Kilogram ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 3 per Kilogram |
Commande minimale: | 10000 Kilogram |
Packaging Detail: | wooden box |
Heure de livraison: | Max.30 days after payment recieved |
Capacité de Fournir: | 60000 Kilogram per Month |
Payment Type: | L/C, T/T |
Groupe de produits : | Valve |