Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Set Minimum Order
Pays:
Turkey
N ° de modèle:
TUNNEL FORMWORK SYSTEM
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
TURKEY
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
Pallet
Heure de livraison:
7-10 days for a set
Capacité de Fournir:
4 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
-
Turkey
Personne à contacter Mr. Emrah
100 YIL MAH. RESIT GALIP CD. 15/1, ANKARA, CANKAYA
NERU has been producing and distributing tunnel formwork worldwide for over *5 years. There is no other construction technique that can compare to Tunnel Form in terms of speed of construction, quality of finish, long life, low labour costs with high production levels, proven superior earthquake resistance.
Pays: | Turkey |
N ° de modèle: | TUNNEL FORMWORK SYSTEM |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | TURKEY |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | Pallet |
Heure de livraison: | 7-10 days for a set |
Capacité de Fournir: | 4 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | - |