Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
TUNNEL FORMWORK TUNNEL FORMWORK TUNNEL FORMWORK
Next

TUNNEL FORMWORK

( Negotiable )

|

1 Set Minimum Order

Pays:

Turkey

N ° de modèle:

TUNNEL FORMWORK SYSTEM

Prix FOB:

( Negotiable ) Obtenir le dernier prix

Localité:

TURKEY

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

Pallet

Heure de livraison:

7-10 days for a set

Capacité de Fournir:

4 Set per Month

Payment Type:

T/T, L/C

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Emrah

100 YIL MAH. RESIT GALIP CD. 15/1, ANKARA, CANKAYA

Contacter maintenant

La description

NERU has been producing and distributing tunnel formwork worldwide for over *5 years. There is no other construction technique that can compare to Tunnel Form in terms of speed of construction,  quality of finish, long life, low labour costs with high production levels, proven superior earthquake resistance.

Also due to the system being all steel faced Tunnel Form therefore offers long formwork lifespan, given multiple reuses and therefore offering superior economy. NERU Tunnel Formwork is an attractive option,  with our expert trained technical team providing advanced project solutions and with our factory, using the latest machinery, advanced manufacturing techniques and well trained staff we produce the perfect tunnel form for your project needs. Tunnel Formwork is NERU's expertise. 
  • Economy: Being able to use the formwork for hundreds and hundreds  of reuses drastically reduceds ±nvestment costs.
  • Quality: With a near perfect surface finished resulting from the all steel face of the forwmork, only minimal fine plastering or direct painting is required saving follow up labour costs. The use of prefabricated components such as door frames, kitchen surfaces and cupboards leads to standardization of follow up purchasing. 
  • Applications: Can be used anywhere. With its intrinsically fast daily construction cycle and its proven resistance to earthquake and other natural disasters the system can be used worldwide. A simple and systematic that can be taught and learned very quickly by your workforce.
  • Modular: With each projects specific formork needs being produced from many standardized components, these parts can readily stored at the end of the construction. Modifiaction is easy, according to the new projects requirements new components can be added to the existing tunnel formwork and then construction on the new project can then commence.

Pays: Turkey
N ° de modèle: TUNNEL FORMWORK SYSTEM
Prix FOB: ( Negotiable ) Obtenir le dernier prix
Localité: TURKEY
Prix de commande minimale: -
Commande minimale: 1 Set
Packaging Detail: Pallet
Heure de livraison: 7-10 days for a set
Capacité de Fournir: 4 Set per Month
Payment Type: T/T, L/C
Groupe de produits : -

Mots-clés correspondants SOLBATI INTERNATIONAL TRADE

Send a direct inquiry to this supplier

To:

Mr. Emrah < SOLBATI INTERNATIONAL TRADE >

Je veux savoir: