Prix FOB
Obtenir le dernier prix500 ~ 800 USD / Metric Ton ( Negotiable )
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
tubular steel pile
Prix FOB:
500 ~ 800 USD / Metric Ton ( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
500 per Metric Ton
Commande minimale:
1 Piece
Packaging Detail:
ulk cargo, pipe cap, steel strips bundled
Heure de livraison:
25 days
Capacité de Fournir:
2000000 Metric Ton per Year
Payment Type:
Western Union, D/P, L/C, T/T
Groupe de produits :
China
Personne àcontacter Ms. Iris
22nd Floor, South Building in Longchamp Garden HotelÃ�ï&Ac, Changsha, Hunan
1.Commodity:Â tubular steel pile
Â
2.Specification:ÂÂ
Executive Standard: ASTM A **2, ASTM A*3, EN****7,  DIN ***8, SY/T ***0,GJ/T ***2
3.Material: ASTM A*3, SS**0, Q******5, Q**5(A, B, C), *6Mn,Â
Â
4.Outer Diameter: **9mm-***0mmÂÂ
  Wall Thickness: 4.*6mm-*0mm
Â
5.Surface treatment: Painting, oil coating, Anti-corrosion &Insulation.ÂÂ
Â
6.Ends: Pipe cap, Beveled edges or plain end, the protection of pipe end, anyway according to customers' requirment.ÂÂ
Â
7.Package: Bulk cargo, pipe cap, steel strips bundledÂÂ
Â
8.Delivery time: According to the quantiyÂÂ
Â
If you have any interest, please don't hesitate to contact us via iris(at)threewaysteel(dot)com or iris-yangmei(at)hotmail(dot)comÂ
Â
Thanks & Best RegardsÂ
Iris Yang
Pays: | China |
N ° de modèle: | tubular steel pile |
Prix FOB: | 500 ~ 800 / Metric Ton ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 500 per Metric Ton |
Commande minimale: | 1 Piece |
Packaging Detail: | ulk cargo, pipe cap, steel strips bundled |
Heure de livraison: | 25 days |
Capacité de Fournir: | 2000000 Metric Ton per Year |
Payment Type: | Western Union, D/P, L/C, T/T |
Groupe de produits : | welded steel pipe |