The Detail of lampblack purifier By zhengzhou Jingtian environmental protection equipment co., LTD.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
The Detail of lampblack purifier
Next

The Detail of lampblack purifier

400 ~ 600 /

|

1 Piece Minimum Order

Pays:

China

N ° de modèle:

EA200

Prix FOB:

400 ~ 600 / Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

400

Commande minimale:

1 Piece

Packaging Detail:

Lined plywood box with foam plastics

Heure de livraison:

15~20 days

Capacité de Fournir:

15 Piece per Month

Payment Type:

-

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter haoran

Zhengzhou Industrial Road &Aviation Road intersection, Zhengzhou, Henan

Contacter maintenant

Spécification du produit

  • Process air volume:4000 m3 / h

La description

First. Workflow 
Equipment operators must understand the function of the device, the principle, the basic structure, known as the device operating essentials, equipment maintenance manuals, operating procedures after this before operating this equipment, prohibit the use of ultra-performance.
 
Preparation of the second. Job before 
1. Check the power system and the door should be closed and sealed.
2. Check the equipment grounding conductor is solid.
3, the contact between the power supply and the electrodes should be in good contact.
4, it is determined by the voltage and the device voltage match.
 
Third Requirements job of
1, after the completion of the examination was normal before power, turn the fan power control switch, when the cleaner power instructions box, the green light, it means cleaner work has started functioning.
2, such as start, if the red light blinks occasionally, indicating that a discharge phenomenon between the electrodes, is a normal phenomenon.
3, electrical control box cleaner switch is normally open when the fan power control switch is turned on, along with starting the purifier.
4, smoke purifier frequency adjustment. Each purifier has a corresponding controller and inverter. Each region set up a common inverter control , now has cleaner adjusted to the appropriate frequency, for further adjustment, gently turn the inverter control s to adjust the appropriate location.
 
The fourth requirement. Job after 
1. fume purification fume treatment process: fume - hood - duct - fume purification - Fans - Chimney - Emissions - Oil outward processing.
2. After use, turn off the fan power control switch, the system is turned off.
3. The oil emissions. Fume purification after a period of time, due to internal filled with oil, purifying effect is decreased significantly. Therefore, during use, should be carried out within the oil cleaner emissions, a hole is normally open state, and the exclusion of oil were cleared up.
 
V. routine inspection maintenance
Purifiers use for some time, to carry out maintenance and repair of equipment in order to play to extend the life of purification and purification efficiency, cleaner pretreatment within the network, the electric field cleaned once every two to three months.
 

Pays: China
N ° de modèle: EA200
Prix FOB: 400 ~ 600 / Obtenir le dernier prix
Localité: -
Prix de commande minimale: 400
Commande minimale: 1 Piece
Packaging Detail: Lined plywood box with foam plastics
Heure de livraison: 15~20 days
Capacité de Fournir: 15 Piece per Month
Payment Type: -
Groupe de produits : oil and smoke cleaner

Send a direct inquiry to this supplier

To:

haoran < zhengzhou Jingtian environmental protection equipment co., LTD. >

Je veux savoir: