Prix FOB
Obtenir le dernier prix400 ~ 600 /
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
EA200
Prix FOB:
400 ~ 600 / Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
400
Commande minimale:
1 Piece
Packaging Detail:
Lined plywood box with foam plastics
Heure de livraison:
15~20 days
Capacité de Fournir:
15 Piece per Month
Payment Type:
-
Groupe de produits :
Personne àcontacter haoran
Zhengzhou Industrial Road &Aviation Road intersection, Zhengzhou, Henan
First. WorkflowÂ
Equipment operators must understand the function of the device, the
principle, the basic structure, known as the device operating
essentials, equipment maintenance manuals, operating procedures
after this before operating this equipment, prohibit the use of
ultra-performance.
Â
Preparation of the second. Job beforeÂ
1. Check the power system and the door should be closed and
sealed.
2. Check the equipment grounding conductor is solid.
3, the contact between the power supply and the electrodes should
be in good contact.
4, it is determined by the voltage and the device voltage
match.
Â
Third Requirements job of
1, after the completion of the examination was normal before power,
turn the fan power control switch, when the cleaner power
instructions box, the green light, it means cleaner work has
started functioning.
2, such as start, if the red light blinks occasionally, indicating
that a discharge phenomenon between the electrodes, is a normal
phenomenon.
3, electrical control box cleaner switch is normally open when the
fan power control switch is turned on, along with starting the
purifier.
4, smoke purifier frequency adjustment. Each purifier has a
corresponding controller and inverter. Each region set up a common
inverter control , now has cleaner adjusted to the
appropriate frequency, for further adjustment, gently turn the
inverter control s to adjust the appropriate location.
Â
The fourth requirement. Job afterÂ
1. fume purification fume treatment process: fume - hood - duct -
fume purification - Fans - Chimney - Emissions - Oil outward
processing.
2. After use, turn off the fan power control switch, the system is
turned off.
3. The oil emissions. Fume purification after a period of time, due
to internal filled with oil, purifying effect is decreased
significantly. Therefore, during use, should be carried out within
the oil cleaner emissions, a hole is normally open state, and the
exclusion of oil were cleared up.
Â
V. routine inspection maintenance
Purifiers use for some time, to carry out maintenance and repair of
equipment in order to play to extend the life of purification and
purification efficiency, cleaner pretreatment within the network,
the electric field cleaned once every two to three months.
Â
Pays: | China |
N ° de modèle: | EA200 |
Prix FOB: | 400 ~ 600 / Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 400 |
Commande minimale: | 1 Piece |
Packaging Detail: | Lined plywood box with foam plastics |
Heure de livraison: | 15~20 days |
Capacité de Fournir: | 15 Piece per Month |
Payment Type: | - |
Groupe de produits : | oil and smoke cleaner |