Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
In bundle
Heure de livraison:
20 days
Capacité de Fournir:
1000 Square Meter per Day
Payment Type:
L/C, T/T
Groupe de produits :
Personne à contacter Mr. Honway
Hustpark, Development zone, Xingtai, Hebei
Table formwork, slab formwork, ceiling formwork, concrete formwork, shuttering, horizontal formwork
The HORIZON table formwork is designed to be used typically in large area slab concreting. The table formwork can be shifted horizontally and vertically without being dismantled, which provides a costeffective and efficient solution for the slab work on site.
Advantages:
1. The table formwork is assembled on site and shifted from one area to another without dismantling, thus minimizing added risks in erection and dismantling.
2. Very easy assembly, erection and striping, which reduce labor cost.
3. Safety. Handrails are available and assembled in all the perimeter tables, and all these work are done at ground before the tables are put in place.
4. The table height and leveling is quite easy to adjust by means of adjusting props height.
5. The tables are easy to move horizontally and vertically with help of trolley and crane.
Can match well with Doka and Peri formwork systems.
Xingtai Horizon Formwork Co., Ltd., the manufacture of formwork system, formwork accessories and scaffolding parts. We supply: wall formwork, slab formwork, steel prop, jack base, wing nut, tie rod, water stop, washer plate, formwork clamp, plate anchor etc.
Pls contact us on hw**2 at hotmail dot com
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | In bundle |
Heure de livraison: | 20 days |
Capacité de Fournir: | 1000 Square Meter per Day |
Payment Type: | L/C, T/T |
Groupe de produits : | Slab formwork |