Swimming Pool Starting Blocks By Guangzhou Jumi Network Technology Co., Ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Swimming Pool Starting Blocks Swimming Pool Starting Blocks Swimming Pool Starting Blocks Swimming Pool Starting Blocks Swimming Pool Starting Blocks
Next

Swimming Pool Starting Blocks

43 ~ 923 /

|

5 Minimum Order

Pays:

China

N ° de modèle:

HX-01

Prix FOB:

43 ~ 923 / Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

43

Commande minimale:

5

Packaging Detail:

-

Heure de livraison:

10-25 days. FOB ports: Huangpu/Nansha, Guangzhou

Capacité de Fournir:

-

Payment Type:

T/T, L/C, PayPal

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Jane

Guangzhou, Guangdong

Contacter maintenant

La description

Material: stainless steel and FRP

Color: blue

Step: one step

Use: school or competitive pool

Business type: factory

Packing: carton

Accept ODM & OEM

Type: swimming pool equipment

The swimming pool starting blocks are made of FRP and stainless steel **4. It conforms to international standards. The surface is anti-slippery. The sustaining bracket underneath is made of **4 stainless steel, which is durable and strong. The pool starting blocks measures up the international standard,quality is very good.

1. Swimming pool starting platform appearance must meet the requirements of FINA. For example, installation swimming pool starting platform surface need to higher than ****0 cm above the surface of the water, the starting board at least *0 cm square meter, the forward tilt is <*0ordm.
2. The diving platform technical need to meet the requirements of the provisions of FINA. For example, the handshake must be designed in front of the diving platform and higher water surface ****0 cm.  the starting handshake is on the same vertical surface. The horizontal grips are parallel to the horizontal plane and the vertical grip is perpendicular to the horizontal plane. The starting edge of the forefront of the thickness of not more than 4 cm, or both sides of the starting table at least *0 cm long front at least *0 cm long into the body 3 cm handshake slot.
3. The starting station material need durable, not rust, no corrosion, and the diving platform is non-slip material, mark clear Arabic numerals around the diving platform.

SWIMMING POOL STARTING BLOCKS CHARACTERISTICS:

a.Made of **4 stainless steel, solid and durable.
b.The starting block measures up the international standard.
c.Made of FRP + Stainless steel, skid-proof surface, standard size, quality is very good.
d.New and fashionable design.
e.Convenient for you to ship and install.
f.The platform can be replaced.

Pays: China
N ° de modèle: HX-01
Prix FOB: 43 ~ 923 / Obtenir le dernier prix
Localité: -
Prix de commande minimale: 43
Commande minimale: 5
Packaging Detail: -
Heure de livraison: 10-25 days. FOB ports: Huangpu/Nansha, Guangzhou
Capacité de Fournir: -
Payment Type: T/T, L/C, PayPal
Groupe de produits : Fenlin

Mots-clés correspondants Guangzhou Jumi Network Technology Co., Ltd

Send a direct inquiry to this supplier

To:

Jane < Guangzhou Jumi Network Technology Co., Ltd >

Je veux savoir: