Prix FOB
Obtenir le dernier prix|
1 Set Minimum Order
Pays:
China
N ° de modèle:
SC200/200
Prix FOB:
Localité:
China(Mainland)
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
20'GP and 40'HQ Container
Heure de livraison:
20 days at Qingdao Port after the advance deposit
Capacité de Fournir:
80 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Amy
Zheshan Industrial Park,Mingshui, Jinan, Shandong
Rated
load(kg)
|
2****0
|
Rated
passengers(Number)
|
2**0
|
Rated
lifting speed(m/min)
|
*4.4
|
Motor
power(kw)
|
2*3**1
|
Motor
braking torque(N.m)
|
**0
|
Overrun
protection device braking speed(m/min)
|
****6
|
Overrun
protection device rated braking load(KN)
|
*0
|
Max.lifting
height(m)
|
******0
|
Cage
size(L*W*H) (m)
|
3.2*1.5*2.6
|
Mast
section size(L*W*H) (m)
|
0.*0*0.*0*1.**8
|
Mast
weight(kg)
|
**2
|
Rated
erection load(kg)
|
**0
|
Electric
Switch Box
|
Schneider
|
Pays: | China |
N ° de modèle: | SC200/200 |
Prix FOB: | Obtenir le dernier prix |
Localité: | China(Mainland) |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | 20'GP and 40'HQ Container |
Heure de livraison: | 20 days at Qingdao Port after the advance deposit |
Capacité de Fournir: | 80 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | Construction Hoist |