Prix FOB
Obtenir le dernier prix|
1 Minimum Order
Pays:
China
N ° de modèle:
HF
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. Xiaodan
No.4600 West Victory, Weifang, Shandong
***** chart of process flow: Decoiling*-active feeding**-forming**-measuring lengh**-cutting**-product to stand ***** equipment: Decoiler, main forming machine, hydraulic cutting, electric system(plc), hydraulic system, product stand. ***** parameters 1)Profile thickness:0.***1.0mm 2)inner tight decoiler ***** inner diameter:**0mm****0mm ***** width of coiling:***0mm ***** weight of loading:***0kg 3)main forming machine A.Shaft material:*5# steel, bearing steel outer diameter *5mm ***** motor power:5.5kw ***** speed:****0m/min D.Voltage:**0v, *0hz ***** station:*5 4)cutting system A.hydraulic cutter B.Blade and mould material:Cr*2 steel with quenched treated ****2° ***** system advanced hydraulic drive, after automatic cutting after forming. 5)control system A.PLC ***** 6)hydraulic system A.Power:3kw 4.Spare Parts 1).Easy damaged parts: conk 2 pcs, fuse-link 4 pcs 2).Rubber mat 1 pcs; 3).Bolt spanner 1 pcs Terms: 1.Delivery:according to customers' requirement 2.Package:export standard package for container 3.Payment:TT (*0% by TT in advance, *0% by TT after you inspect machine we need) 4.Delivery date:within *0 working days after receiving deposit 5.Products Warranty:*2 month, and we will provide the technical support for whole life of the equipment.
Pays: | China |
N ° de modèle: | HF |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |