steel pipe, steel tube By shanghai yebao metal products., ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
steel pipe, steel tube
Next

steel pipe, steel tube

|

1 Metric Ton Minimum Order

Pays:

China

N ° de modèle:

steel pipe

Prix FOB:

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1 Metric Ton

Packaging Detail:

1.Black oil, bundles with firm steel strips 2.Package can also be made as per your requirements

Heure de livraison:

Within 20-30days after receiving the deposit

Capacité de Fournir:

-

Payment Type:

Money Gram, Western Union, L/C, T/T

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter kerry

Anping county, Hengshui, Hebei

Contacter maintenant

Spécification du produit

  • Standard: EN1,API ,ASTM
  • Grade: 10#, 45#, API J55, API N80, API L80, Q23...
  • Thickness: mm
  • Secondary Or Not: Non-secondary
  • Application: Fluid Pipe
  • Technique: ERW
  • Certification: API
  • Surface Treatment: Galvanized
  • Special Pipe: API Pipe
  • Alloy Or Not: Non-alloy
  • Material:GRB ,X42,J55,X65 S35

La description

We supply many types of steel pipe,the following is part of our products:

Description

Hot Rolled Seamless Carbon Steel Pipe

Supply Capacity

****0 tons/year

Process Method

Hot Rolled

Out Diameter

*****0 mm

Wall Thickness

***5mm

Length

SPECIFIC OR AT RANDOM as required

Steel Grade

ASTM A**6 B , A *3B, API 5L B, *0#, *5# , *0Cr

Standards

ASTM / ASME, GB, DIN, JIS, T****5, etc.

Specification

O.D: (*****0mm)

W.T: SCH5S, SCH*0S,SCH*0S,SCH*0S,SCH**0S,etc. (0.***0 mm)
Or non-regular size to be tailored as required.

Packing

1.with plastic cap to protect both ends
2.plastic bag wrapped outside the pipe
3.bundles to be covered by polythene & strapped securely .

Certificate

ISO ***1:***8  ,  API 5L Grade B

Delivery time

****0 days depend on Quantity

Payment Term

T/T, Irrevocable L/C at sight

Trade Term

FOB , CFR , CIF

Pays: China
N ° de modèle: steel pipe
Prix FOB: Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: 1 Metric Ton
Packaging Detail: 1.Black oil, bundles with firm steel strips 2.Package can also be made as per your requirements
Heure de livraison: Within 20-30days after receiving the deposit
Capacité de Fournir: -
Payment Type: Money Gram, Western Union, L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

kerry < shanghai yebao metal products., ltd >

Je veux savoir: