Prix FOB
Obtenir le dernier prix( Negotiable )
|0.3 Ton Minimum Order
Pays:
China
N ° de modèle:
Stainless Steel Heat Exchanger Tubes
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
-
Commande minimale:
0.3 Ton
Packaging Detail:
Ply-wooden Case /Iron Case/ Bundle with plastic Cap
Heure de livraison:
30-60 days up to the order quantity
Capacité de Fournir:
1500 Ton per Month
Payment Type:
T/T, L/C, Money Gram
Groupe de produits :
China
Personne àcontacter gary
Tianyi, Ningbo, Zhejiang
1.PRODUCT | seamless stainless steel heat exchanger tube | ||||
2.STANDARD | ASTM,AISI,ASME,JIS,DIN,EN,GB,BS,SUS | ||||
3.MATERIAL |
|
||||
4.OD | ****1Â mm | ||||
5.WT | 0.**8Â mm | ||||
6.LENGTH |
1). 5.8m,6m *2m 2).random length or as customer request |
||||
7.TYPEÂ | Seamless&welded | ||||
8.TECHNIC | Hot Rolled; Cold Rolled; Cold Drawn | ||||
9.SURFACE | Pickling,annealing,manual polish and mechanical polish , mirror polish | ||||
*0.PACKING |
 Standard seaworthy package (1.plywood case2.wooden pallet package 3.bundlepackage and other package or as customer request) |
||||
*1.DELIVERY |  Normally according to the order quantity or upon negotiation | ||||
*2.APPLICATION |
Stainless steel tube are widely used in below fields: 1).Petroleum,Chemical enterprise, superheater of boiler, heat exchanger 2).High temperature resistant transmission fluid pipe in power station 3).Ship with pressure pipe 4).The exhaust purification devices 5).Construction and ornament |
||||
*3.PRICE ITEM | EXW,FOB,CFR,CIF,DAF or as negotiated | ||||
 *4.QULITY      CONTROL |
 Mill Test Certificate is supplied with shipment, Third Part Inspection is  acceptable.  |
||||
 *5.EXPORT TO |
 Southeast Asia, Mid East, Africa, Eastern Asia, Western Europe Ect | ||||
*6.AUDITED |
 We are BV and SGS audited company |
Â
Â
Â
Â
Â
Pays: | China |
N ° de modèle: | Stainless Steel Heat Exchanger Tubes |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 0.3 Ton |
Packaging Detail: | Ply-wooden Case /Iron Case/ Bundle with plastic Cap |
Heure de livraison: | 30-60 days up to the order quantity |
Capacité de Fournir: | 1500 Ton per Month |
Payment Type: | T/T, L/C, Money Gram |
Groupe de produits : | Stainless Steel Heat Exchanger Tubes |