Stability Test Chamber By ALP Technology,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Stability Test Chamber
Next

Stability Test Chamber

|

1 Piece Minimum Order

Pays:

China

N ° de modèle:

YP series

Prix FOB:

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1 Piece

Packaging Detail:

plywood

Heure de livraison:

20 days

Capacité de Fournir:

-

Payment Type:

PayPal, L/C, T/T

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Kevin

No.263, south Tai bai Road, Xian, Shaanxi

Contacter maintenant

Spécification du produit

La description

Special technical services of the case which passed stability test by 3Q

Through a series activities such as: DQ (design confirmation), FAT (Manufacturers factory test), IQ (installation qualification), OQ (Operation confirmation), PQ (operating performance confirmation), the data and conclusions can prove that if the equipment can meet the requirements of production process, if equipment performance meet the requirements of design & products and GMP standard.


1.     Purpose of DQ: according to customer demand and production process, by compare with contract and drawing in order to review equipment performance, material, structure, accessories, control, instrument, etc, to confirm the rationality and reliability of products in design process.
2.     Purpose of FAT: through a series of experimental test by manufacture proves the quality and reliability of the equipment before delivery also prove the equipment can satisfy the basic requirements of design confirmation, products standard and international requirements of GMP.
3.     Purpose of IQ: by installation, commissioning and validation activities,a series of data were offered to validate if installation documents & conditions & outcome of stability testing case can comply with the design requirements, datum and document can meet the requirements of GMP management.
4.     Purpose of OQ: check instrumental and test report supplied by validate side at first, check and test equipment technology parameter, confirm the operation of equipment performance meet the design requirements, and related requirements in accordance with GMP requirements.
5.     Purpose of PO: by the qualification of installation and operational confirmation, test corresponding sample based on the specific craft of customer manufacturer, confirm the operation of equipment performance meet the design requirements, and related requirements in accordance with GMP requirements.

 


The new generations of stability test chamber, assemble year’s experience of design and production, and introduce into German technology, breach the defect of existing cast which can not endure long time and continuous operation. It adopting advanced technology of double compressor takes turns switch, and main imported parts performance is stable and reliable.

1.      Imported closed compressor, use R**4a environmental protection refrigerants, low noise, high efficiency, long service life.
2. Imported touch screen controller, large process control, a precise and reliable control, with R**2 interface.
3. Data record, online data acquisition, imported recorder with paper, two data recording mode selection.

Pays: China
N ° de modèle: YP series
Prix FOB: Obtenir le dernier prix
Localité: -
Prix de commande minimale: -
Commande minimale: 1 Piece
Packaging Detail: plywood
Heure de livraison: 20 days
Capacité de Fournir: -
Payment Type: PayPal, L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Mr. Kevin < ALP Technology >

Je veux savoir: