Prix FOB
Obtenir le dernier prix|
50 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
50 Piece
Packaging Detail:
Neutral package or according to clients' requirments.
Heure de livraison:
20-30 days
Capacité de Fournir:
10000 Piece per Month
Payment Type:
Western Union, T/T
Groupe de produits :
Personne àcontacter Ms. INNA
Dongyi Industry Zone, Fengqiao Town, Zhuji City, Zhejiang Province, China, Shaoxing, Zhejiang
1.NO.:T***0(KAMAZ), T***4(KAMAZ), T***4DD,
T***4DD, T***0DD, T***0DD, T***4DP, T***4DP, T***0DP,
T***0DD(Sealed), T***0DD(Sealed)
2.Features:
·Working pressure: **0kPa
·Maximum working pressure: 1MPa.
·Pushrod stroke: 0 - *0mm
·Ambient temperature: - *0 **0
·Life-time: service chamber: 1, **0, **0 times
·Leading Standard: SAE J**6 **5
Â
      NO.    |  OEM NO. | Stroke |  Port  Thread | Bolt  Thread |  Bolt  Centre | Push Rod Thread | Whole Push Rod Length |
T*0/*0DD | **5 **2 **2 0 | *4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T*0/*0DD | **5 **2 **2 0 | *4/*4 | 3/8NPT | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T*0/*0DD | **5 **2 **2 0 | *4/*4 | 3/8NPT | 5/8UNC | **0.7 | 5/8UNC | **5MM |
T*0/*0DP | **5 **2 **6 0 | *7/*7 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **0MM |
T*0/*0DP | **5 **2 **6 0 | *7/*7 | M*2×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **0MM |
T*0/*0DP |
**5 **2 **1 0(L) **5 **2 **1 0(L) |
*4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **0MM |
T***0DD(Sealed) |  | *4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T***0DD(Sealed) |  | *4/*4 | 3/8NPT | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T***0DD(Sealed) |  | *4/*4 | 3/8NPT | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T***0DP(Disc Brake) |  | *4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | Φ*6 | **5MM |
T***0DP(Disc Brake) |  | *4/*4 | M*2×1.5 | M*6×1.5 | **0.7 | Φ*6 | **5MM |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 50 Piece |
Packaging Detail: | Neutral package or according to clients' requirments. |
Heure de livraison: | 20-30 days |
Capacité de Fournir: | 10000 Piece per Month |
Payment Type: | Western Union, T/T |
Groupe de produits : | brake chamber |