Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
DO, DOD, DON, ST
Prix FOB:
Localité:
shenzhen
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
carton, wooden case
Heure de livraison:
12 work days
Capacité de Fournir:
-
Payment Type:
T/T, D/P
Groupe de produits :
-
Personne àcontacter liu
:No.132 Hengping Road.Henggang Town, Shenzhen, Guangdong
 1 Various options of controller,CON4,ST***5M and ST***5T
2 Time setting :user can set waiting time from 0 to *2 hours.
3. temperature setting:it can adjusted from *****0 ℃ or
******0℉
4. High temperature cut-off for both sauna room and sauna heater.
Double safety protection
5Â stainless steel shell is optional
Pays: | China |
N ° de modèle: | DO, DOD, DON, ST |
Prix FOB: | Obtenir le dernier prix |
Localité: | shenzhen |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | carton, wooden case |
Heure de livraison: | 12 work days |
Capacité de Fournir: | - |
Payment Type: | T/T, D/P |
Groupe de produits : | - |