La description
High
EfficiencyGenerators
•We
useMarathon
Electricgenerators,
which for over **0 years have been the gold standard in electric
generators.
•The
system uses ahigh
torqueSwitched
Reluctance Square Motorto act as a
regulator of thegenerator
speed, ensuring a
constant***0RPM
producing*0 Hz
at*0 kW of
power.
For *0 Hz
markets, the generator
is turned at ***0 RPM to achieve
the correct frequency.
ElectronicPower
Controllers
•Managesthe
energy quality voltage Hz/output and the harmonics, thus
eliminating spikes and surges, which keep the sine waves
insync.
•Allows
for remote satellite monitoring *4/7
of unit
temperature, RPMs, battery charge, and Kw
output.
CompactModular Design
•Small
Footprint – 7.*5ft x 5ft x 5ft
•1
*0 kW unit only takes approximately *0
ft2(4m2)
•Scalable
and Stackable
Units can be
stacked up to 3 high
Background
•Developed
overtwoyearsago by
leading engineers in the United
States.
•Validated,
tested, and certified bythe
NationalRenewable
Energy Laboratory , which is the leading independent verification
and testingentityforgovernment
agencies reviewing
renewableenergy
technology andsystems.
•Underwriters
Laboratory (“UL”) tested and
approved.
•California
Energy Commission Approved.
•Given
United Nations Gold Standard
#1Advantage
•Signiï¬cantcost
savings in electricity.
•Ourcost
of energy is far less than diesel fueled power plants and
comparable to coal and natural
gas.
•A
long-term power solutionthat
willnot
increaseincost.
•Thereis
NO price increase for the term of the
contract.
•No
capital outlay required to purchase
equipment.
•BOT
contract available for qualified
customers.
#2Advantage
•
Our Systems usea fraction
of the land of traditional solar
systems.
•Thespace
required for a hybrid solar system is 1,****3,**0 sq. ft. for
eachMegaWatt
ofenergy.
•Renewable
energy source that can easily be expanded to meet your growing
energy demands.
•Simply
add more units at any time to increase
capacity.
Providesdomestically
produced power,pavingthe way for
true energy independence.
What Are
NextSteps?
•1.)
Request for & Fill out Questionnaire given to you by a
Vibrant Comm sales associate.
•2.)
Letter of Intent (LOI) supplied by customer.
Provide Totals Of 4 Months Of Current Kwhs consumed by your local
billing statement Just total Kwhrs and total cost per month paid
Or a copy of your statement is fine
also.
•3.)
Vibrant'sGlobal’sengineering
team will review power generation requirements and proposed
location for the power Gen system.
•4.)
A site survey will be conducted to determine
feasibility.
•5.)
Power Purchase Agreement (PPA) will be negotiated based on
information gathered during the site
survey.
•6.)
Permits and land will be secured by the customer, Vibrant
Comm.Inc. can give guidance if
necessary.
7.)
Installation can begin within ****0 days of securing
permits
Only Serious Buyer Inqires
Pays: |
Philippines |
N ° de modèle: |
60Kw up 5GW Power Generators
|
Prix FOB: |
(Negotiable)
Obtenir le dernier prix
|
Localité: |
- |
Prix de commande minimale: |
- |
Commande minimale: |
1 Unit |
Packaging Detail: |
Self Containerized |
Heure de livraison: |
Sea Freight FM USA |
Capacité de Fournir: |
10 Unit per Month |
Payment Type: |
L/C, D/A, D/P, Other |
Groupe de produits : |
Electric Power Generation
|