Prix FOB
Obtenir le dernier prix( Negotiable )
|- Minimum Order
Pays:
China
N ° de modèle:
API
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
25 kgs bags or according to customer's requirement
Heure de livraison:
15 days after order being confirmed
Capacité de Fournir:
-
Payment Type:
D/P, D/A, T/T
Groupe de produits :
-
Personne àcontacter Robert
Xianyang, Shaanxi
1. Introduction
   CMC can reduce water loss, and increase viscosity
in drilling fluid, cementing fluid and fracturing fluid. They play
the roles of protecting the wall of well, taking drilling trifles,
protecting drilling bit, preventing mud loss and increasing
drilling rate.It is widely applied in various waterbased drill
fluid systems, having a good suspension effect,emulsion stability
and fluid loss effect as well.The mud cake formed is smooth and
tough.
2. Technical indext(Performance standard: API)
Â
    Item | Index |  |  |  |  |  |  | ||||
Starch or starch derivative | N/A | Â | Â | Â | Â | Â | Â | ||||
Deionized water solution | ≥*0 | Solution viscometer with reading value **0r/min | |||||||||
*0g/L salt water solution | ≥*0 | Solution viscometer with reading value **0r/min | |||||||||
Saturated salt water solution | ≥*0 | Solution viscometer with reading value **0r/min | |||||||||
Suspension filtration, m/L | ≤*0 |  |  |  |  |  |  |
Pays: | China |
N ° de modèle: | API |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | 25 kgs bags or according to customer's requirement |
Heure de livraison: | 15 days after order being confirmed |
Capacité de Fournir: | - |
Payment Type: | D/P, D/A, T/T |
Groupe de produits : | - |