Personne àcontacter Mr. Wei
YangGuangSubsidiaryBuilding308,DiDang,Yuecheng District, Shaoxing, Zhejiang
1.The fuel of the power plant is nature gas and 0# diesel,and the single cycle output power is *2MW.
2. The power plant was put into operation in December ***5,and modified from diesel to gas project in the end of ***4. The total running time is ****0 hours,and the hours of operation for nature gas is ***0 hours. The number of starts is***0 times.
3. The company shipped the gas turbine units to GE Houston for overhauling. Replaced new combustion chamber for using both nature gas and diesel , replaced new HPT and new LPT.The nature gas system is also equipped with a set of integral gas compressor goup for nature gas boost (nature gas can boost from 0.*5MPa to 4.6MPa) ,rated flow is ****0 standard square per hour.
4. It contains the fuel system,circulating water system,all of the equipments are in a good conditon.
Pays: | China |
N ° de modèle: | LM6000 sigle cycle |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |