Prix FOB
Obtenir le dernier prix550 ~ 800 / Ton
|5 Ton Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
550 ~ 800 / Ton Obtenir le dernier prix
Localité:
Tianjin
Prix de commande minimale:
550 per Ton
Commande minimale:
5 Ton
Packaging Detail:
standard export package or according to customers' requirements
Heure de livraison:
15-20 days after receving the deposit or L/C issue
Capacité de Fournir:
10000 Ton per Month
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne à contacter Bill
天津市å—开区海益国际, Tianjin, Tianjin
seamless steel pipe tube metal boiler iron pipe
Product name |
seamelss steel pipe tube metal boiler iron pipe |
Standard |
GB JIS ASTM AISI DIN ect |
Material |
ASTM A **9 A*3 A**6,API5L Gr.B X*0 X*2,Q**5B, Q**5B, Q**5C, *0#, *2Cr1MoV,*5CrMo, TP**4,**6 **0S.S**5JR ect |
Thickness |
****0mm |
Schedule |
SCH5S,SCH*0S,SCH*0,SCH*0,SCH*0,SCH*0S,SCH*0,STD,SCH*0,SCHXS,
SCH**0,SCHXXS,ect |
Outer diameter |
****0 mm |
Length |
5.8m 6m *2m or as customer demand |
Used area |
Petroleum,chemical,power, gas, water, metallurgy, shipbuilding, construction , etc Or as customer demand |
Package |
In bundles, Varnish coating, Ends can be beveled or square cut, End capped |
Certification |
ISO***1.***0, , API, Mill Test Certificate |
Thirdparty inspection |
OMIC,SGS, or as customer demand |
Remark |
We can customer made for special requirement |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 550 ~ 800 / Ton Obtenir le dernier prix |
Localité: | Tianjin |
Prix de commande minimale: | 550 per Ton |
Commande minimale: | 5 Ton |
Packaging Detail: | standard export package or according to customers' requirements |
Heure de livraison: | 15-20 days after receving the deposit or L/C issue |
Capacité de Fournir: | 10000 Ton per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | - |