Prix FOB
Obtenir le dernier prix10 ~ 20 / Piece
|100 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
10 ~ 20 / Piece Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
10 per Piece
Commande minimale:
100 Piece
Packaging Detail:
Steel pallet and stretch film or as the customer's request.
Heure de livraison:
Within 20 days after received L/C or deposit.
Capacité de Fournir:
5000 Piece per Day
Payment Type:
L/C, T/T
Groupe de produits :
Personne àcontacter Ms. Coco
Mengjiang Rd, Industrial Agglomeration Area, Anyang County, Henan, China, Anyang, Henan
1.Outer diameter: *6mm
Â2.Length: ***0mm
Â3.Material: ISO **0 Fe A / DIN EN ****5 Fe **0 B
Â4.Pipe thickness: 3mm*4mm
Â5.Surface finish: Deep galvanize to DIN EN ISO ***1
Â6.Packing: Steel pallet and stretch film
Â7.Applications: Foundation system for solar mounting system, fences, wooden house, advertising, boards, flag poles, etc.
Â8.Soil conditions: clay, gobi desert, gravel, need pre-drilled in the hard soil conditions and rocks.
Â9.Drawing force: *5.5KN
Â*0.Loading power: *0KN
Â*1.Horizontal torque force: *0KN
Â*2.Advantage: Easy installation by spiral piling machine without digging and concrete, much convenient, cost effective, time saving and environmentally friendly than concrete foundations, could be quickly and easily erected and removed without any waste.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 10 ~ 20 / Piece Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 10 per Piece |
Commande minimale: | 100 Piece |
Packaging Detail: | Steel pallet and stretch film or as the customer's request. |
Heure de livraison: | Within 20 days after received L/C or deposit. |
Capacité de Fournir: | 5000 Piece per Day |
Payment Type: | L/C, T/T |
Groupe de produits : | Screw Piles |