scaffodling plank By Shenzhen King Hardware,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
scaffodling plank
Prev
scaffodling plank
Next

scaffodling plank

6 ~ 35 / Piece

|

1000 Piece Minimum Order

Pays:

China

N ° de modèle:

KH-SW-250-001

Prix FOB:

6 ~ 35 / Piece Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

6 per Piece

Commande minimale:

1000 Piece

Packaging Detail:

10pcs/bundle or as per customer's instruction

Heure de livraison:

7~15 days

Capacité de Fournir:

8 Twenty-Foot Container per Week

Payment Type:

PayPal, Western Union, L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Fu

Room B303, Jingying Garden, No. 3, Jingsha 2nd Road, Shajing Street Office, Shajing Town, Bao'a, Shenzhen, Guangdong

Contacter maintenant

Spécification du produit

  • Galvanized scaffolding steel plank deck platform for contruc:Galvanized scaffolding steel plank deck platform for contruc

La description

Product detail:
 
1.Galvanized scaffolding steel plank deck platform for contruction and scaffolding system
 
2.Material:Q***-Q**5
 
3.Surface treat:hot-dipped galvanised
 
4.Width:**0,**5,**0,**0,**0,**0,**0mm
 
5.Thickness: 1.**2.0mm
 
6.Length: To be produced as per your requirement
 
7.Folding box should be more stronger
 
8.Patent holes design to be reduced products' weight
 
9.Patent ribs make products stronger and drain the water providing any rain days 
 
*0.Life time:5 years guarantee
 
Dimension:
 
 

Item Wide (mm) Height (mm) Thickness (mm) Length (m) Folding Box support bracket Weight (kg)
KH-SW*******1 **0 *5 1.1 1.0 Normal flat support 3.*4
KH-SW*******2 **0 *5 1.1 1.5 Normal flat support 5.*2
KH-SW*******3 **0 *5 1.1 2.0 Normal flat support 6.*9
KH-SW*******4 **0 *5 1.1 2.5 Normal flat support 8.*6
KH-SW*******5 **0 *5 1.1 3.0 Normal flat support *0.*3
KH-SW*******6 **0 *5 1.1 4.0 Normal flat support *3.*8
KH-SW*******7 **0 *5 1.1 1.0 Normal rectangular support 3.*4
KH-SW*******8 **0 *5 1.1 1.5 Normal rectangular support 5.*2
KH-SW*******9 **0 *5 1.1 2.0 Normal rectangular support 7.*9
KH-SW*******0 **0 *5 1.1 2.5 Normal rectangular support 9.*6
KH-SW*******1 **0 *5 1.1 3.0 Normal rectangular support *0.*3
KH-SW*******2 **0 *5 1.1 4.0 Normal rectangular support *4.*8
KH-SW*******3 **0 *5 1.1 1.0 Normal trapezoid support 3.*1
KH-SW*******4 **0 *5 1.1 1.5 Normal trapezoid support 5.*6
KH-SW*******5 **0 *5 1.1 2.0 Normal trapezoid support 7.*0
KH-SW*******6 **0 *5 1.1 2.5 Normal trapezoid support 8.*4
KH-SW*******7 **0 *5 1.1 3.0 Normal trapezoid support *0.*8
KH-SW*******8 **0 *5 1.1 4.0 Normal trapezoid support *4.*7
KH-SW*******9 **0 *5 1.1 1.0 Equilateral flat support 3.*5
KH-SW*******0 **0 *5 1.1 1.5 Equilateral flat support 5.*2
KH-SW*******1 **0 *5 1.1 2.0 Equilateral flat support 6.*9
KH-SW*******2 **0 *5 1.1 2.5 Equilateral flat support 8.*6
KH-SW*******3 **0 *5 1.1 3.0 Equilateral flat support  
KH-SW*******4 **0 *5 1.1 4.0 Equilateral flat support *3.*8
KH-SW*******5 **0 *5 1.1 1.0 Equilateral rectangular support 3.*5
KH-SW*******6 **0 *5 1.1 1.5 Equilateral rectangular support 5.*2
KH-SW*******7 **0 *5 1.1 2.0 Equilateral rectangular support 7.*9
KH-SW*******8 **0 *5 1.1 2.5 Equilateral rectangular support 9.*6
KH-SW*******9 **0 *5 1.1 3.0 Equilateral rectangular support *0.*3
KH-SW*******0 **0 *5 1.1 4.0 Equilateral rectangular support *4.*8
KH-SW*******1 **0 *5 1.1 1.0 Equilateral trapezoid support 3.*1
KH-SW*******2 **0 *5 1.1 1.5 Equilateral trapezoid support 5.*6
KH-SW*******3 **0 *5 1.1 2.0 Equilateral trapezoid support 7.*0
KH-SW*******4 **0 *5 1.1 2.5 Equilateral trapezoid support 8.*4
KH-SW*******5 **0 *5 1.1 3.0 Equilateral trapezoid support *0.*7
KH-SW*******6 **0 *5 1.1 4.0 Equilateral trapezoid support *3.*4
KH-SW*******7 **0 *5 1.0 1.0 Normal flat support 3.*7
KH-SW*******8 **0 *5 1.0 2.0 Normal flat support 6.*3
KH-SW*******9 **0 *5 1.0 3.0 Normal flat support 9.*0
KH-SW*******0 **0 *5 1.0 4.0 Normal flat support *2.*7
KH-SW*******1 **0 *5 1.0 1.0 Normal trapezoid support 3.*5
KH-SW*******2 **0 *5 1.0 2.0 Normal trapezoid support 6.*1
KH-SW*******3 **0 *5 1.0 3.0 Normal trapezoid support 9.*8
KH-SW*******4 **0 *5 1.0 4.0 Normal trapezoid support *2.*5
KH-SW*******5 **0 *5 1.2 1.0 Normal rectangular support 4.*6
KH-SW*******6 **0 *5 1.2 2.0 Normal rectangular support 7.*2
KH-SW*******7 **0 *5 1.2 3.0 Normal rectangular support *1.*8
KH-SW*******8 **0 *5 1.2 4.0 Normal rectangular support *4.*4

 
 
Features:
 
1. The Pierced Steel Plank(PSP)is strong, light, simple, fool proof, safe and inexpensive.
 
2. It is so simple that it can be laid on any fairly level piece of land with a few days work.
 
3. It is so foolproof that if some parts are lost, it will still be useful. It must be safe for
any type of construction, under any weather conditions.
 
4. It is be so light that it can be transported swiftly and easily to any spot
 
5. The PSP(Piereced Steel Plank) was designed with holes to reduce the weight,
improve traction and facilitate drainage. Flanging the holes kept the mat durable
by compensating for the strength lost by removing a portion of the metal
 
 
Wide variety of consumers:
 
1. Temporary and permanent aircraft landing fields or runways
 
2. Temporary roadways or access routes for trucks, heavy equipment, backhoes, concrete trucks, tree trimmers and cranes.
 
3. Construction Sites
 
4. Helicopter Landing Pads
 
5. Irrigation Tracks
 
6. Launches and boat ramp extensions
 
7. Corrals and chutes for livestock
 
8. Warehouse flooring 9. Mobile home moving
 
*0. RV tracks or storage areas
 
*1. Storage platforms for heavy equipment, supplies or runways.
 
 
How to extend scaffolding walking Board
 
1.Have a 'competent person' assess and document the needs of the area for extended
scaffolding. A 'competent person' in some states is required to have special licensing,
and in others experience with scaffolding set up is enough. What is important is that
you keep some form of documentation that the person designated as 'competent'
approves each step of the scaffolding assembly
 
2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,
make sure that the supports for your scaffolding plans follow the assembly plans
 
3.Lay your first plank across the supports of your platform. Have your competent
person check that each plan extends a minimum of 6 inches and a maximum of
*2 inches past any support bracket.
 
4.Extend your scaffolding plank by laying the next plank over it. If the span
of your support is 7 feet, your plans must overlap a minimum of 6 inches up
to a maximum of *2 inches. If the span of your plank support is *0 feet, the boards
must overlap *2 inches.
 
5.You may provide cleats to additionally connect your extended scaffold planks again.
Ask your competent person to designate that the cleats are provided and used only
to prevent the scaffold planks from sliding and not as a means of providing any
re-enforcement to the boards at all.
 

Pays: China
N ° de modèle: KH-SW-250-001
Prix FOB: 6 ~ 35 / Piece Obtenir le dernier prix
Localité: -
Prix de commande minimale: 6 per Piece
Commande minimale: 1000 Piece
Packaging Detail: 10pcs/bundle or as per customer's instruction
Heure de livraison: 7~15 days
Capacité de Fournir: 8 Twenty-Foot Container per Week
Payment Type: PayPal, Western Union, L/C, T/T
Groupe de produits : Scaffolding Plank

Send a direct inquiry to this supplier

To:

Fu < Shenzhen King Hardware >

Je veux savoir: