Prix FOB
Obtenir le dernier prix20000 ~ 40000 / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
SC200/200
Prix FOB:
20000 ~ 40000 / Set ( Negotiable )Obtenir le dernier prix
Localité:
Qingdao Shandong China
Prix de commande minimale:
20000 per Set
Commande minimale:
1 Set
Packaging Detail:
container in nud
Heure de livraison:
15 days after deposit
Capacité de Fournir:
20 Set per Month
Payment Type:
T/T, L/C, Western Union
Groupe de produits :
Personne àcontacter Mr. Tonny
Hefei road, Qingdao, Shandong
Product Description
QSH construction Hoist is a
rack and pinion EL. Lift, used on construction site for
transportation of personnel and materials. It is installed and
dismounted conveniently and can grow as high as the building grow
in height.Â
There're single cage and two cages hoists. A single cage can be
quickly transformed into twin cages hoist by adding a cage and
other parts. The hoist payload can be increased by adding
counterweight equipment.Â
SC hoist has reliable electrical and mechanical safety device, it
is efficient and safety vertical transporting
equipment.Â
Steelwork of building hoist is shaped through semiautomatic
gas-protection welding with high-quality steel.Â
The steelwork surface is processed with phosphating and finish
baking treatment or hot galvanizing treatment according to
customers' requirements.Â
The suspension cages can be decorated with steel wire mesh or
perforated aluminum plate.
Â
Safety Equipment Measures:
1. A Master switch On the operation board: When the closed, unexpected action to other s can not let cabin working.
2. Anti-falling safety device (with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.  Â
3. Mechanical inter-locking door: when the cabin running it can  close by itself from protecting people from dropping.  Â
4.Overload calling device            Â
5. upper and lower travel limit: They can limit the cabin go over the top mast.   Â
6.The top mast section have no rack in order to limit the cabin overrunning and dropping .Â
7. Manual : You can operate the botton to let the cabin go down when interruption of power supplyÂ
Emergency switch: When the cabin losing control and over-runing, you can operate the .
Pays: | China |
N ° de modèle: | SC200/200 |
Prix FOB: | 20000 ~ 40000 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | Qingdao Shandong China |
Prix de commande minimale: | 20000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | container in nud |
Heure de livraison: | 15 days after deposit |
Capacité de Fournir: | 20 Set per Month |
Payment Type: | T/T, L/C, Western Union |
Groupe de produits : | construction hoist |