Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
YLRA10-50
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
Wooden Package
Heure de livraison:
25days after getting the deposit
Capacité de Fournir:
30 Set per Week
Payment Type:
Other, Western Union, L/C, T/T
Groupe de produits :
Personne àcontacter Ms. Julia
No.88 Shantong Road, Shangyang Town, Jinshan District
Unit features: |  |  |  |  |  |  |  |
1¼ | Supre-wide capacity range from 25KW ½360KW for your better selection. |  |  |  |  |  |  |
2¼ | Monobloc self-contained structure to save piping connection work. |  |  |  |  |  |  |
3¼ | The airflow direction could be adjusted according to different capacity. |  |  |  |  |  |  |
4, | Unit's panel is cold roll metal with coating and stainless screw against long-time corrosion. |  |  |  |  |  |  |
5, | Hydraulic-coating aluminum fin with copper tube for heat exchanger to |  |  |  |  |  |  |
 | high-efficiency heat transfer. |  |  |  |  |  |  |
6, | Double refrigerant circuit(2 or 4)ensures unit more stalbe operation, max 4 |  |  |  |  |  |  |
 | compressors design to decrease the problems of the unit. |  |  |  |  |  |  |
7, |
Super-large size access door design to save the maintenance work.  |
 |  |  |  |  |  |
Pays: | China |
N ° de modèle: | YLRA10-50 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | Wooden Package |
Heure de livraison: | 25days after getting the deposit |
Capacité de Fournir: | 30 Set per Week |
Payment Type: | Other, Western Union, L/C, T/T |
Groupe de produits : | rooftop unit |