QXL-series new high-capacity compound circulating water-tube hot water boiler By Shandong Tai'an Shankou Boiler Group co.ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
QXL-series new high-capacity compound circulating water-tube hot water boiler
Next

QXL-series new high-capacity compound circulating water-tube hot water boiler

15000 ~ 60000 / Set

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

DZL

Prix FOB:

15000 ~ 60000 / Set Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

15000 per Set

Commande minimale:

1 Set

Packaging Detail:

standarding packing

Heure de livraison:

after payment 20 days

Capacité de Fournir:

20 Set per Month

Payment Type:

D/P, D/A, L/C, T/T

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter gary

Daiyue District,Tai'an City,Shandong Province,China, Taian, Shandong

Contacter maintenant

Spécification du produit

  • reliable :durable

La description

1The front and back water cooled wars and arc tubes all adopt backwater forced injection equipment,so as to guarantee that water speed in heated pipes of these circulation loops can far exceed the minimum security speed duing operation ,thus ensuring safety of water circulation during power outage.

2The side water wall tube and convention bank adopt forced circulation ,so as to make sure that water speed in this series of tubescan far exceed the minimum security speed ,wash away sediment at the lower part of the cylinder body ,and com-pleetely eliminnate the possibility of water wall tube explosion .if water outage happens during running ,the side water wall tube and convention bank will automatically form natural circulating loop, thus fully ensuring operation safety of the side water wall tube and convention bank.

3The boiler furnace is covered in the inner side of convention heating surface ,as flue gas temperature in flue pipes on two sides and forepart convention heating suface is low.so the heat preservation effect is remarkable and skining radiation loss is now.

4The front and back arches adopt diversion design ,the back arch is low ,long and of high coverage ,combustion of high temperature flue gas can sweep past coals afire and rush to the front arch with the aid of the back arch ,coal newly added into types ,complte combustion and high boiler heat efficiency.

5the boiler body is of frame structurd ,and adopts paralled composite structure of the side water wall tube and convention bank as supporting componoent of the entire boiler .under operative mode ,heating surface of the boiler can carry out thermal expansion unward freely ,which elimates thermal stress and makes the structure stable and reliable ;

6Convention heating surface of the boiler all adopt flue gas cross-flow scrubbing mode,which not only leads to high heat transfer efficiency of heating surfance large output and fast speed in temperature rise ,but can also reasonably devise and fix up soot door and access door in flues of convention heating surfance ,which is quite convenience for operation management and overhauling also extremely import for operating high-capacity hot water boiler with great amplitude of running load variation.

7Compared with boilers with other furance profiles and same capacity ,due to the use of water-tube heating surface and lower supporting entity structure ,the new high-capacity compound circulating water-tube hot water boiler is about *5%**5%than others, and the higher the capacity is ,the larger the amplitube of height reduction will be which will greatly redudce cin-struction cost of boiler room and lower investment of users;

8The adoption of inertia isolation technique of smoke and dust within furnace renders the initial dust emission concentration of the boiler greatly lower than the requorments in GB****1emission standard of air pollutants for boilers .

Note;It is preferable to adopt high-temperature running and toeradicate long-term running with outlet temperature of *0℃

Pays: China
N ° de modèle: DZL
Prix FOB: 15000 ~ 60000 / Set Obtenir le dernier prix
Localité: -
Prix de commande minimale: 15000 per Set
Commande minimale: 1 Set
Packaging Detail: standarding packing
Heure de livraison: after payment 20 days
Capacité de Fournir: 20 Set per Month
Payment Type: D/P, D/A, L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

gary < Shandong Tai'an Shankou Boiler Group co.ltd >

Je veux savoir: