La description
After the product flows from the double-speed chain to this
station, the OCV test is performed first to ensure that the
voltage and impedance meet the product process requirements;
Prismatic lithium battery pack assembly line Design Information:
Blueprint: Based on 1P8S module PACK
No Model Parallel series type Size(L*W*H)mm type Remark
1 EVE **0Ah 1P8S (blueprint) Â
In addition to the blueprint, additional tooling, pallets, etc.
are required for compatibility, which is a value-added service
OCV test and NG removal station introduction:
After the product flows from the double-speed chain to this
station, the OCV test is performed first to ensure that the
voltage and impedance meet the product process requirements;
After the OCV test is completed, enter the next NG removal
station, and the NG products will be placed on the NG product
conveyor belt through the three-axis handling module to flow out;
the OK products are stored in the refilling position, waiting for
refilling;
Flip gripping and manipulator gluing station introduction
Pays: |
China |
N ° de modèle: |
-
|
Prix FOB: |
(Negotiable)
Obtenir le dernier prix
|
Localité: |
- |
Prix de commande minimale: |
- |
Commande minimale: |
- |
Packaging Detail: |
- |
Heure de livraison: |
- |
Capacité de Fournir: |
- |
Payment Type: |
- |
Groupe de produits : |
- |