Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
zhenli
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
in wooden plate, need GP or HQ containers
Heure de livraison:
30 days after order confirmation
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Ms. Cary
Baotang 50, Jiangmen, Guangdong
Â
Â
Standard ConfigurationÂ
Â
Two-Stage Injection Adjustment |
High Speed Clamping |
Low Pressure Clamping Device |
Automatic Mould Thickness Adjustment |
Computer - Controlled Lubrication System. |
Hydraulic Moving Clamping Unit |
Hydraulic Multiple Ejector |
Nozzle Heater , Gooseneck Heater |
Inclined Clamping Unit |
Fuel-Injection Furnace |
Siemens **0 control system with LCD monitor |
Â
 Â
Machine ConfigurationÂ
Â
Siemens **0 control system with LCD monitor (Germany). |
Imported components are used for hydraulic units including YUKen (Janpan), Rexroth (Germany) and Vickers (USA)to ensure the stability of hydraulic system |
Sealing members are bought from Sealtech of Hong Kong or Veco of France. |
Sealing members are bought from Sealtech of Hong Kong or Veco of France |
Posts and columns are purchased from Zhen Jiang HUA DING. |
Electric parts are purchased from France Schneider. |
Â
Â
Â
 After-sales Service
When machine arrives at the Buyers factory, the seller will appoint engineer to your factory for
machine  commissioning and installation and training workers.Â
Â
Â
Â
WarrantyÂ
We provide one year warranty for machine and three months for easy-broken Parts.Â
Â
Â
Â
Pays: | China |
N ° de modèle: | zhenli |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | in wooden plate, need GP or HQ containers |
Heure de livraison: | 30 days after order confirmation |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |