Prix FOB
Obtenir le dernier prix|
25 Metric Ton Minimum Order
Pays:
China
N ° de modèle:
YH
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
25 Metric Ton
Packaging Detail:
standard seaworthy packing
Heure de livraison:
45 days
Capacité de Fournir:
1000000 Metric Ton per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter lily
NO168Qiangao Road, Wuxi, Jiangsu
Prepainted steel coil/PPGI
1.Operate Standard:ASTM A**3M**4/JIS
G***2/DIN EN*******4/GBT ***8
2.Grade:SGCC(DX*1D-Z),SPCC,SPCD,SPCE
3.Thickness:0.***0.9mm
4.Width:*******0mm(common:***0mm)
5.ID:**8mm,**0mm
6.Color:all RAL (common:sea blue, white grey and bright red)
7.Paint material:Normal polyester(PE,Epoxy)
8.Thickness of top coating:****5um,Thickness of back coating:***0um
9.Coil Weight;***0MT
*0.Package Method:Vertical/Horizontal, full wrapped with anti-moist paper inside,iron sheet wrapped outside, and bundled by iron strips
*1.Production Ability:*****0MT/Year
Â
Features:
1).Uses hot galvamume  metal strip as the base
material
2).Zinc layer protection,dope on the zinc layer can cover and
protect metal strip from rust
3). Color coated sheet is light, beautiful and has good anti-erosion performance
4). Can be further processed directly, corrugated or formed
etc.
5). Life span of PPGI is usually 1.5 times longer than that of
galvanized steel coil
6). They are mainly applied for construction,decoration,roofing
title,wall panel,furniture,transportation and other
industries
7). Common specifications: within 0.*6 - 0.7 x **4 x C
8).Random coating colors according to customers’ requirements,
common colors are sea blue, white grey and bright red. Prepainted
coil is painted twice on the upper surface of hot galvanized
metal strip side of the base material
9).As a rich experience manufacturer, we provide quality product,competitive price and reliable after-sales service
Pays: | China |
N ° de modèle: | YH |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 25 Metric Ton |
Packaging Detail: | standard seaworthy packing |
Heure de livraison: | 45 days |
Capacité de Fournir: | 1000000 Metric Ton per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | steel products |