La description
Prefabricated Steel Structure Workshop
The prefabricated steel structure workshop is used as industrial
painting workshop, covers an area of ***0 sqm, located in
Thailand.
Prefabricated steel structure workshop details:
The industrial steel structure workshop adopts portal frame
structure
1. Design Technical Parameters:Â
Wind load: *5m/s; Earthquakegrade: 6degrees
Structural type: portal frame
Steel workshop size: **0**5*9m(Length*Width*Eave Height)
2. Main steel structure part: Welded H steel columns and beams
painted, other sub-members are **0% galvanized with Q**5B
material
3. Roof and wall purlin: hot-dip galvanized C section steel with
Q**5B material
4. Workshop Cladding System:
Roof insulation material: 0.5mm V***0 type ocean blue cladding
sheet with Zn layer *0g/m2
Wall insulation material: 0.5mm V***0 type white grey cladding
sheet with Zn layer *0g/m2
5. Door: sliding door, *0m*7m*4sets
6. Crane: 4*5T over-head crane
Our Services
One-stop services: We can provide * one-stop solutions including
customized designing, fabrication and erection according to your
requirments.Â
Why Choose Us
Powerful manufacturer: a leading steel structure company of north
China which having developed for over *0 years with factory area of
**0,**0 sqm and supply ability of ***0T/Month
Customized Design: over *0 professional engineers servicing for
your to make full solution drawings as per your requirments
Production Capacity: with the annual capacity of *0,**0 Tons
Quality Assurance: **0% of products with detailed inspection by
over *0 experienced & skilled QA/QC inspectors
Prompt Response: Over *0 experienced international sales mangers
are on line *4/7
After Sales: Providing the service of installation, supervision and
training local workers by extra
Pays: |
China |
N ° de modèle: |
Steel Workshop-03
|
Prix FOB: |
35 ~ 80 / Square Meter (Negotiable)
Obtenir le dernier prix
|
Localité: |
Qingdao, China |
Prix de commande minimale: |
35 per Square Meter |
Commande minimale: |
100 Square Meter |
Packaging Detail: |
1. Main steel structure frame fixed on steel pallet with wool blanket in case of damage during deliv |
Heure de livraison: |
30 days |
Capacité de Fournir: |
1500 Ton per Month |
Payment Type: |
L/C, T/T |
Groupe de produits : |
Steel Structure Workshop
|