Prix FOB
Obtenir le dernier prix0 ~ 100000 USD ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
XC-11-211
Prix FOB:
0 ~ 100000 USD ( Negotiable )Obtenir le dernier prix
Localité:
Dongguan, China
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
by PE Bag Inside and Carton Outside
Heure de livraison:
2-8weeks
Capacité de Fournir:
-
Payment Type:
PayPal, Western Union, T/T
Groupe de produits :
Personne à contacter Ms. Sunny
B Building,2nd industrial Zone,Wusha, Changan, Dongguan, Guangdong
Part Name: Plastic Mold for Shower Head
Plastic Moulded Parts/Plastic injection parts
1. We are a professional plastic mold and injection moulding
parts manufacturer, which can provide from Mold Design, Tool
Building, Injection, Machining, Measuring Dimenstion, Secondary
Operation, Packing, Assembly, Exporting, and After-Service
2. Our main products include precise mold, plastic products,
silicon products, Parts for automotive, consumer product etc.
3. High quality, close tolerance plastic parts production.
4. Good surface treatment, strict international tolerance
standard.
5. Welcome to your drawings (such as 2D and 3D) or samples for
quoting
Available Plastic material: | such as PS, ABS, HIPS, PP, PVC, PMMA, PBT, PC, RUBBER, SILICON RUBBER, etc. |
Mold Structure: | Double color injection mold, insert mold, solid mold, mold with slides, mold with lifters, etc. |
Mould Base Material: | LKM, FUTA, HASCO, DME, etc. or as per customer' s requirement. |
Cavity/Core Steel: | A& D, ASSAB, Daido, ALCOA, AL CAN, Local steel for small volumn, or based on customer' s requirement. |
Cavity: | Single cavity, Multi Cavity, based on customer' s requirement. |
Runner Type: | Cold or Hot Runner (Syventive, Mold Master, HASCO/DME/YUDO etc. ) |
Mould Life: | **0, **0 to 1, **0, **0 shots |
Design & Program Soft wares: | CAD/CAM/CAE, UG, Po-E, Solid works etc. |
Equipments: | CNC, EDM, ArgieCharmilles, Milling Machine, 3D CMM, Projector, HG, Injection Machine |
Package: | Wooden case packing, Carton, PE or OEM packing |
Mold building lead time: | **8 weeks (normal, within 4weeks) |
Pays: | China |
N ° de modèle: | XC-11-211 |
Prix FOB: | 0 ~ 100000 ( Negotiable ) Obtenir le dernier prix |
Localité: | Dongguan, China |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | by PE Bag Inside and Carton Outside |
Heure de livraison: | 2-8weeks |
Capacité de Fournir: | - |
Payment Type: | PayPal, Western Union, T/T |
Groupe de produits : | Home Appliance Parts |