Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Plastic concrete building moulding board no need oil formwork molds panels Plastic concrete building moulding board no need oil formwork molds panels
Next

Plastic concrete building moulding board no need oil formwork molds panels

18 ~ 38 / Piece

|

50 Piece Minimum Order

Pays:

China

N ° de modèle:

Plastic concrete building moulding board no need oil formwork molds panels

Prix FOB:

18 ~ 38 / Piece Obtenir le dernier prix

Localité:

China

Prix de commande minimale:

18 per Piece

Commande minimale:

50 Piece

Packaging Detail:

Carton and tray

Heure de livraison:

5-10days

Capacité de Fournir:

1000 Piece per Day

Payment Type:

T/T, L/C, Western Union, Money Gram, PayPal

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Luna

Jiaozuo, Henan

Contacter maintenant

Spécification du produit

  • Place of Origin:Henan, China
  • Name:Plastic concrete building moulding board no need oil formwor
  • Application:Concrete Construction
  • Color:Black,Gray
  • Size:915mm*1830mm,1220mm*2440mm
  • Thickness:15mm-18mm
  • Material:PP plastic
  • Certificate:SGS

La description

The building formwork is a temporary supporting structure, which is made according to the design requirements, so that the concrete structure and members are shaped according to the specified position and geometrical dimensions, maintaining their correct position, and bearing the self-weight of the building formwork and the external load acting on it. The purpose of the formwork project is to ensure the quality of concrete works and construction safety, speed up construction progress and reduce engineering costs.
The building formwork structure used for the construction of cast-in-place concrete structures is mainly composed of three parts: panel, support structure and connecting parts. The panel is a bearing plate directly contacting the newly poured concrete; the supporting structure is a temporary structure supporting the panel, the concrete and the construction load, ensuring that the building formwork structure is firmly combined so as not to be deformed or damaged; the connecting piece is the panel and the supporting The structure is connected into an integral fitting.

 


The raw materials for our products are PP plastic, fiberglass and calcium carbonate.In order to strength the plastic hardness, we add glassfiber in the raw materials, it will make the final products reuse longer time and make the surface to keep flat. 
 
The advantages of our plastic formwork:
1.Strong enough to resist the pressure or the weight of the fresh concrete plus any
constructional live loads.
2. Rigid enough to retain the shape without undue deformation.
3. Economical in terms of the total cost of the forms and the concrete surface finishing when required.
4. Sufficiently watertight to avoid leakage at the joints.They have impervious surfaces that usually create a smooth finish to the concrete. 

Plastic concrete formwork construction technology:
1. According to the engineering structure design drawing, the model design of the wall, column, beam and board is respectively carried out, and the specifications and quantity of the required plastic formwork and accessories are calculated.
2. Prepare a special construction plan for the formwork project.
3. Check the stiffness, strength and stability of the template and the bracket.
4. Formulate relevant measures to ensure the quality of the formwork, construction safety and plastic formwork management.
5. Develop the process flow of the mold and the mold removal.
 
Inspection method of Yaohang Hollow plastic formwork:
1. Flexibility test
Toughness test when the template is bent: Use a forklift to crush the template that is not in the same plane (one side is grounded, one side is placed obliquely), and the template is intact without damage after rebound.
2.Weight capacity detection Use a small round head hammer to slam the smooth surface of the plastic building template and observe the surface depression. Good quality building templates will have depressions, but there will be no cracks.
3.Shrinkage testThe two templates are placed side by side on the wooden board to record the gap distance between the two boards. After two days and two nights, the difference is not more than 3mm*5mm compared with the previously measured data.
4.Nail-holding strength Nail at a distance of 5 mm from the edge of the plate. If there is no crack, this indicates that the quality of the plate is good; after the nail is nailed, observing whether the bonding state of the nail and the template is saturated and tight.

 

1.Q: Are you a factory or trading company?

A: We are a factory of reusable construction formwork material.

2.Q: How can I get some samples?

A: We are honored to offer you free samples.

3.Q: How does your factory control quality?

A: Quality is priority. We always control from the very beginning to the end , from the raw materials to the production. Every batch of materials, we must test the quality about the impact stength , Vicart , bending strength. Our factory has gained ISO***1:***8.

4.Q: How many times does your formwork reused?

A:It can be reused over *0 times.

5.Q: Does this formwork stick concrete? and easily remove or not?

A:It doesn't stick concrete and easily remove, even no need any release agent, only tapping can fallen off.

6.Q: How to clean the used formwork?

A: Only using the high-pressure water gun can make it clean.

7. Q: what are your foreigh markets?

A: Middle East countries, Africa countries, the eastern European countries,Oceania countries

 

Pays: China
N ° de modèle: Plastic concrete building moulding board no need oil formwork molds panels
Prix FOB: 18 ~ 38 / Piece Obtenir le dernier prix
Localité: China
Prix de commande minimale: 18 per Piece
Commande minimale: 50 Piece
Packaging Detail: Carton and tray
Heure de livraison: 5-10days
Capacité de Fournir: 1000 Piece per Day
Payment Type: T/T, L/C, Western Union, Money Gram, PayPal
Groupe de produits : plastic concrete building formwork

Send a direct inquiry to this supplier

To:

Ms. Luna < Henan Yaohang Alloy Formwork Co., Ltd >

Je veux savoir: